说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 札林川
1)  Zhalinchuan
札林川
2)  Letter [英]['letə(r)]  [美]['lɛtɚ]
1.
Read The Letter of Additional Promotion to Wang Desheng;
解读《拔补外委王得胜札》
3)  Sichuan forest
四川森林
4)  Muchuan forestry farm
沐川林场
5)  Sichuan forestry
四川林业
1.
And on this basis favourable circumstances are described for the development of Sichuan forestry and the targets and tasks in Sichuan forestry are put forward in the next century.
在分析四川森林资源的现状的基础上,提出四川林业21世纪的发展目标和任务。
2.
This paper reviewed the 60 years developing course of Sichuan forestry,summarized the achievements and experiences in Sichuan forestry development.
围绕推进国土绿化、改善生态环境、实现可持续发展这一主线,全面回顾了四川林业60年的发展历程,总结了四川林业建设的成就和经验。
3.
1 billion yuan indirect economic losses,and have far-reaching effects on Sichuan forestry development.
4亿元,间接经济损失1831亿元,对四川林业发展影响十分深远。
6)  Sichuan wood owl(Strix davidi)
四川林鸮
补充资料:札内川坝

札内川坝

Satsunaigawa Dam


概  述

  札内川坝位于日本北海道河西郡中札内村、十胜川水系(Tokatigawa)札内川上游。碾压混凝土坝,最大坝高114m,水库总库容0.54亿m3。新设札内川电站最大电量为8000kW。1985年开始施工,1993年完工。
  大坝两岸岸坡为40°角,左右两岸表土层较薄,基岩出露较多。大坝附近基岩以砂岩为主,挟有泥质岩。
  坝址控制流域面积117.7km2,水库面积170hm2。正常蓄水位474m,设计洪水位484m。洪水限制水位466m,最低水位447.5m。有效库容0.42亿m3,死库容0.12亿m3,防洪调节库容0.25亿m3,洪水期兴利库容0.17亿m3,非洪水期为0.27亿m3。设计洪水流量840m3/s。
  工程枢纽包括大坝、泄洪隧洞和札内川发电站。
  大坝坝顶高程488m,坝顶长300m,下游面坡度1∶0.8,上游面垂直,贴块混凝土坡度1∶0.4。坝体积约77万m3,第一常用泄洪孔底部高程466m,1个孔口,宽3m,高3m。第二常用泄洪孔底部高程474m,2个孔口,宽2.5m,高2.5m。非常泄洪孔孔底高程484m。洪水期,打开第一常用泄洪孔;非洪水时,打开第二常用泄洪孔。大洪水时,除开启二个常用溢洪孔,同时打开非常泄洪孔。
  坝体采用RCD工法浇筑。坝体上部混凝土运输采用塔式起重机,下部用自卸卡车。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条
阿利札林(染料商名)  蔡家川林场  冰川森林区  河谷川地林网  四川林业产业  四川森林资源 
  ©2011 dictall.com