说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 劲性骨架设计
1)  stiff skeleton design
劲性骨架设计
1.
The article mainly presents the stress analysis and stiff skeleton design at the closure sector.
文章重点介绍合拢段受力分析与劲性骨架设计
2)  Stiff skeleton
劲性骨架
1.
Brief talk on effect of the stiff skeleton in the high pier construction
浅谈劲性骨架在高墩施工中的作用
2.
Combining with the practical cantilever construction of a continuous box beam bridge, authors analyze the setting-up and stress of the stiff skeleton at locking section of the middle span, deduce theoretical calculation formulas for designing a stiff skeleton, and state the influence of stiffness of a stiff skeleton on the general structure of a bridge.
结合某连续箱梁桥悬臂施工实践,对中跨合龙段劲性骨架设置和受力进行了分析,推导了劲性骨架设计的理论计算公式,并分析了劲性骨架刚度大小对桥梁整体结构的影响。
3.
This paper discusses the construction charateristics of a reinforced concrete areh bridge with stiff skeleton of concretefilled steel tubes.
论述了钢管混凝土作为劲性骨架施工的钢筋混凝土拱桥的行为特点,此类桥的结构在施工过程中,历经三种状态:①劲性骨架状态,②劲性骨架的一部分杆件被混凝土包裹的状态,③钢筋混凝土拱业已形成之后的成桥状态。
3)  stiffen framework
劲性骨架
1.
This paper introduces concreter construction scheme, stiffen framework installation, ring pre-stress setting of main tower of Songhuajiang cable-stayed bridge.
本文介绍了松花江斜拉桥主塔混凝土施工方案、劲性骨架安装、环向预应力的布置及控制测
4)  stiff skeleton method
劲性骨架法
1.
In Hongfenghu long Span Bridge construction,stiff skeleton method is adopted to implement closure of main span and side span, by taking a series of measures to assure construction quality,the safe of structure stress and the easement of main beam alignment are assured in the course of closure segment construction.
红枫湖大桥采用劲性骨架法进行边跨和主跨的合龙,并通过采取了一系列确保合龙段施工质量的措施,保证了合龙段施工过程中结构受力的安全和主梁线形的平顺。
5)  non-rigid skeleton
无劲性骨架
6)  the steel skeleton
劲性钢骨架
1.
The initial stress of the steel skeleton is explained, then the methods of testing the initial stress are presented, and some problems such as the welding techniques of the steel skeleton, the temporary fixing of arch springing, the swing system, the bracket removal and closure of the steel skeleton are discussed.
对劲性钢骨架初始应力状态进行了阐述,提出了检测实际初始应力的施工监控手段,并对钢骨架的焊接、拱脚临时固结、转动体系、骨架张拉脱架和骨架合龙等有关技术问题提出了自己的看法。
2.
Connecting with the field process and assembly of the steel skeleton for Diaozhongyan arch bridge, this paper introduces the coordinates calculation of the steel skeleton, the construction bracket, the welding parameter of the Q345-C steel, the controlling of welding deformation, assembly technology and etc.
结合吊钟岩特大桥劲性钢骨架的现场加工拼装施工,对劲性钢骨架坐标计算、施工胎架、Q345-C钢材焊接参数、焊接变形控制、拼装工艺等方面进行了介绍,为今后同类劲性钢骨架施工提供了成功经验。
补充资料:连续性与非连续性(见间断性与不间断性)


连续性与非连续性(见间断性与不间断性)
continuity and discontinuity

11an父ux泊g四f“山。麻以角g、.连续性与非连续性(c。nt,n琳t:nuity一)_见间断性与不间断性。and diseo红ti-
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条