1) main cable construction
主缆施工
1.
This paper takes LanCang Jiang suspension bridge as the background project and does researches on the main cable construction under temperature effect.
本论文以澜沧江悬索桥为工程背景,就主缆施工阶段温度效应的施工控制问题,有针对性地展开研究。
2) cabling construction
线缆施工
3) submarine cable operation
海缆施工
1.
Furthermore,the matters needing attention and the necessary measures during the submarine cable operations in the sand wave area are proposed,which will provide reference for the submarine cable operations in China Sea sea bottom sand wave area.
基于中国海大陆架区海底沙波的分布、形态和移动特征,分析了沙波对海缆施工的埋设张力和埋设深度的影响。
4) cable installation
电缆施工
1.
This paper describes the features, difficulties, methods and problems of cable installation management in power plant project invested by foreigners.
介绍涉外电厂工程电缆施工管理的特点、难点、方法及应注意问题。
5) optical cable layout
光缆施工
6) main construction
主体施工
1.
Problems need attention to the installation supervision in the main construction;
安装监理在主体施工时应注意的问题
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。