说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 敞泄滞洪
1)  Discharging openly for flood detention
敞泄滞洪
2)  complete discharge
敞泄
3)  flood discharging
泄洪
1.
Study of reaction of dredging mouth bar on flood discharging and sediment sluicing in lower river channel of the Yellow River;
黄河口拦门沙疏浚对尾闾河道泄洪排沙影响的研究
2.
Taking into consideration the flood,geological and tailrace conditions,as well as the layout of the project,the way of flood discharging and energy dissipation of the project complex was optimized at the construction details design stage by reference to the flood discharging and energy dissipation design experience of other medium-sized hydropower projects of its kind at.
在参考国内中型水电站的泄洪消能设计经验后,结合土卡河的洪水、地质条件、尾水条件及枢纽布置特点,在施工详图阶段,对枢纽的泄洪消能方式进行了优化,采取了台阶式溢流坝面加平尾墩及戽式消力池方案,水工模型试验表明该方案是合理的。
3.
The study includes the optimal layout of the flood discharging energy dissipation, the hole arrangement and its type in the dam body, the scour balance and energy dissipation mechanism of water cushion pond, the effect of the flood discharging vi.
高水头大流量泄洪消能研究是“八五”国家科技攻关专题,主要结合小湾高拱坝建设,研究在高山峡谷河段上,高水头、大流量泄洪消能问题。
4)  flood discharge
泄洪
1.
Study on hydroenergy dissipation problem of flood discharge structure of the Three Gorges Project;
三峡工程泄洪建筑物泄洪消能问题研究
2.
Discussion on the problems of general layout, flood discharge and energy dissipation for high arch dam;
高拱坝的枢纽布置与泄洪消能
3.
Effects of flood discharge and regulation of power load on operation of vertical ship lift in hydropower station;
水工枢纽泄洪及电站负荷调节对垂直升船机运行的影响
5)  removing sediment by open outflowing
敞泄排沙
6)  emptying operation
敞泄运用
1.
In addition, the lowering extent of Tongguan elevation was studied under Sanmenxia reservoir emptying operation.
分析了潼关河床的冲淤特性及原因,通过潼关高程的演变过程,详细论述了三门峡水库运用和来水来沙条件对三门峡库区的冲淤及潼关高程的影响程度,并探讨了三门峡水库敞泄运用后,潼关高程的可能降低幅度。
补充资料:滞洪


滞洪


【滞洪】减弱洪峰流量、减轻下游河床负担的措施。通常利用河道附近的湖泊、洼地或预先开辟的滞洪区短期阻滞洪水,或利用河流本身较宽的河床自然滞洪,待洪峰过后,再将滞洪区的积水放归本河下游。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条