1) line for mixed passenger and freight traffic
客货混跑线路
2) mixed running
客货混跑
1.
On the background of construction of Fuzhou-Xiamen railway line, the reasonable station spacing is discussed under the condition of mixed running of freight trains and passenger trains in which the passenger train’s top speed is 200 km/h.
以福厦线为背景,在旅客列车最高速度为200 km/h和客货混跑条件下,对铁路合理站间距离进行了分析研究。
3) multi speed operation of passenger and freight trains
多速度客货混跑
4) mixed passenger and freight railway
客货共线铁路
1.
A brief analysis was made of the necessity of speed increase of mixed passenger and freight railway, especially increase of existing railway to 200 km/h.
简要论述客货共线铁路提速 ,特别是既有线提速 2 0 0km /h的必要性 ;对 3种速度为 2 0 0km/h的暂行规定或技术条件的异同进行对比 ,并提出需要试验研究的速度为 2 0 0km /h客货共线铁路设计中的关键技术问
5) railway bridge mixed passenger and freight
客货共线铁路桥
6) railways with passenger and freight traffic
客货混运
1.
Research purposes: Vibration rules of the track induced by passenger and freight trains for railways with passenger and freight traffic are investigated.
研究目的:分析客货混运铁路专线客车及货车引起轨道振动的规律。
补充资料:跑了和尚跑不了寺
1.见"跑了和尚跑不了庙"。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条