1) concrete elastic stress
混凝土弹性应力
2) rebound testing on pretensioned spun concrete piles
预应力管桩混凝土回弹
3) elastic concrete
弹性混凝土
1.
Experimental study on new elastic concrete and application in bridge expansion joint engineering
新型弹性混凝土试验研究及应用前景
4) concrete stress
混凝土应力
1.
When the deformation method was used for concrete stress calculation,it was assumed that the stress increased suddenly at each stage,and such an assumption led to certain errors.
采用变形法计算混凝土应力时,假设应力在各个时段内以突变形式增加,并对这种假设带来的误差进行了分析。
2.
The measurement of the concrete stress distribution and the circumferential deformation of the cell body in oval sludge digester of Zhangzhou water treatment plant are carried out on site.
对漳州水处理厂卵形消化池工程进行了混凝土应力测试及张拉引起的池壁环向变形测试 ,并将测试结果和有限元计算结果作了对比分析 ,对正常使用时的池壁受力情况进行了评
5) HPPC(high performance prestressed concrete)
高性能预应力混凝土
补充资料:混凝土建筑物应力观测
混凝土建筑物应力观测
stress observation of concrete structure
(steveson crek areh dam)上观测蓄水、放水时的应力。30年代卡尔逊(R,W.Carlson)发明了差动电阻式仪器后,美国在一系列混凝土大坝上如包德(Boul-der)、大古力(Grand eulee)、夏斯塔(Shasta)等进行大规模的应力应变观测,花了18年时何,使混凝土应力应变观测技术和计算方法达到比较完善的水平。70年代以来,观测仪器精度提高,应力应变观测趋向自动化,在资料检测和处理方面应用了电子计算机,使观测效果有了显著提高。中国的应力应变观测工作开始于50年代中期,60年代生产了一系列观测仪器设备,70年代由于仪器性能提高和观测经验的积累,观侧成果的作用日益显著080年代以来,中国在龚咀和葛洲坝等工程中使用自制的自动化检测系统,由于这些自动检测系统能够消除长电缆的电阻影响,且配有微型计算机进行数据处理,观侧精度大大提高,为应力应变观测开创了良好的前景。 应力观测设计应力观测测点布置和水工建筑物的结构形式有密切关系,要和建筑物的应力分布相适应。如①混凝土重力坝应力观测,一般在重力坝的各个坝段中选择一个典型坝段作为观测坝段,在观测坝段选择l一2个垂直坝轴线的观测断面,在距坝基5米以上选择1一2个水平截面作为观测截面,考虑坝体分缝施工特点,在观测截面上布置5一7个应力观侧点。如图1所示。②拱坝应力观测布置见图2。应力测点布置的重点是拱冠和拱座,在拱冠戒拱冠悬臂梁断面作为观测断面.取距坝基5米以上的水平截面3一5个作┌─┐│…│└─┘应力测点重力坝观测截面┌───────┐│ / ││乳.户‘ │├───────┤│口’沙 ││l弓 │└───────┘图l重力坝应力观测布置示意图 -一拱冠观测断面1一1共逗‘工沁_一七一了,/_ Z_枯。占 几121Z_刃a、。协。了/肠俨悦奴多蜘J压铆恶舌O诊甘图2拱坝应力观测布置示意图卜_么。月眺车氢念为观测截面,每个截面上布设2一3个应力测点。对于高拱坝有时在坝肩取径向悬臂梁断面作为观测断面,类似拱冠悬臂梁观测断面布置观测测点。拱座应力观测是将拱坝分成3一5个拱圈,在拱圈两端的径向截面内布置2一3个测点。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条