说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 工期损失
1)  construction time loss analysis
工期损失
2)  loss expectation
损失期望
1.
A rational method of optimum design of disaster resistant structures should have following characteristics: multi - stage optimization, consideration of both the cost and the loss expectation of the structure in the objective function, multi - failure criteria for the structure, practical to use and consistent with the National Design Codes.
讨论了抗灾结构优化设计应该具备的一些特点:抗灾优化的层次性;优化的目标必须既考虑结构的近期投资(造价)又考虑其长远效益(遇灾损失期望);抗灾结构的多级设防原则;最优设防水平的决策;优化方法必须与现行国家设计规范相接轨。
2.
The earthquake-resistant design of jacket platform based on optimal fortification intensity is dis- cussed with Platform BZ28-1 of Bohai Oil Field in China taken as an example,following the principle of three-level fortification and two-stage aseismic design of buildings and both cost and loss expectations taken in- to consideration.
介绍了基于最优设防烈度的抗震结构优化设计的理论和方法,并以渤海油田 BZ28-1储油平台为例,在目标函数中既考虑了结构的造价又考虑了损失期望,根据“小震不坏、中震可修、大震不倒”三个水准的抗震设防原则,利用抗震规范的“二阶段”抗震设计方法,对其进行了结构优化设计,得到了考虑造价和损失期望、基于最优设防烈度的最优设计方案。
3.
In consideration of cost and whole life loss expectation of product, the whole life optimization design model with control parameter of dynamic reliability is proposed.
在同时考虑产品成本价值和全寿命期失效损失期望前提下 ,提出了以动态可靠度为控制参数的全寿命优化设计模型。
3)  expected loss
期望损失
1.
Through studying on the factors that influence parking capacity,the paper puts forward the model of parking capacity based on minimal expected loss and the method of solving the model in the center business district from the asp.
从分析影响停车供给的因素入手,从市场经济的角度提出基于期望损失最小的中心商业区停车供给模型及其求解方法,并阐述了该模型在停车场改扩建中的作用。
2.
the optimum value of α-level was obtainedunder the goal of the expected loss for each test.
以每次检验的期望损失为目标。
3.
Employing the concept of expected loss of risk and the loss function in the case study, conomic benefits of flood control, hydrological network as well as flood forecast are computed respectively.
根据调查资料和本文的方法建立了损失函数曲线,用风险期望损失的概念,计算了防洪、水文站网及洪水预报的经济效益。
4)  long-term prestress loss
长期损失
1.
Coupling analysis of long-term prestress loss and slope creep;
锚索预应力长期损失与坡体蠕变耦合分析
5)  Expected loss
预期损失
1.
This paper gives a comparative analysis of the existed two main categories of deposit insurance pricing models-Merton model and the expected loss pricing model.
本文比较分析了现有的两类主要的存款保险定价模型—— Merton 模型和预期损失定价模型,根据模型的特点指出了每个模型在现实应用中的优点和缺点,并根据我国国情提出了合理的建议。
6)  expected shortfall
期望损失
1.
A kind of coherent measure index,high degree expected shortfall,is used to measure risk.
股指期货交易保证金作为风险控制的手段,应使用满足一致性公理要求的风险测度方法对指数风险进行分析,但现有的方差、Var测度均不满足此要求,高阶期望损失风险测度满足一致性公理要求。
2.
The tools which have been used or proposed mainly are Standard Deviation、Absolute Deviation、Value at Risk(VaR)、Conditional Value at Risk(CVaR)、Worst Conditional Expectation(WCE)、Expected Shortfall(ES).
目前正在使用或已经提出的风险度量的工具主要有标准差、绝对偏差、风险值(Value at Risk,VaR)、条件风险值(Conditional Value at Risk,CVaR)、最坏条件期望(Worst Conditional Expectation,WCE)、期望损失(Expected Shortfall,ES)等。
3.
In order to construct a risk measure which is both coherentand easy to compute and to estimate,the Expected Shortfall (ES)was proposed and discussedby Acerbi et.
[7]提出了期望损失ES(Expected Shorfall)这种风险度量工具,并证明了它满足了一致风险度量,而且能够方便计算,因此,具有很好的研究价值。
补充资料:建设工期
      建设项目或单项工程在建设过程中耗用的时间。即从设计文件所列工程正式破土动工到建成投产(生产出设计规定的合格产品)或交付使用为止所需要的时间,包括建筑、安装、试车、验收、交付使用等所需要的时间,但不包括施工准备时间。一般按日历工月数计算,并明确建设起止年限。
  
  建设工期是具体安排计划、签订经济合同、组织施工、检查工程进度的依据,也是从建设速度的角度反映和考核投资效果的指标。缩短建设工期,尽快形成生产能力,既能减少基本建设投资的占用,节约投资支出,又能为增加额外社会产品和国民收入创造物质技术条件,并使企业能比计划或工期定额规定的时间提前而获得更多的盈利。拖延工期,必然导致大量人力、物力、财力陷入未完工程中,长期不能发挥其经济效益,造成不应有的损失。中国第一个五年计划时期,基本建设工作组织得比较好, 156项骨干项目的建设工期,一般只用三四年时间。以后建设工期逐渐拖长,有的项目建设工期甚至拖长一倍以上。为了加快社会主义现代化建设,必须努力缩短建设工期。国家要求,除了少数工程量特大的项目以外,一般的项目建设工期要缩短到五年以内,大中型纺织厂、轻工厂、机械厂要在二三年内建成。国家责成各部门、各地区,根据本行业、本地区的具体情况,按平均先进水平,分门别类订出同类型、同规模建设项目的工期定额,作为确定具体建设项目工期的依据。大中型项目要按合理工期一次安排建设计划,分配投资和材料,落实建设条件和相关项目的同步建设,分年实施,以保证工程开工后能连续建设,按期建成,并形成综合生产能力,以提高投资效益。建立健全工期责任制,工程按期或提前投产,给予一定的奖励;由于工作上的原因拖长工期,给予经济惩罚。
  
  就组成单项工程的某一个单位工程(如厂房建设或设备安装)的施工而言,则自该单位工程正式动工至完成的时间,在中国称之为施工工期。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条