1) power generation planning
发电规划
1.
For the satisfaction the ever-severe problem of power grid peak regulation, in the introduction of peak-valley difference restrain in to the medium-term power generation planning model has been made at first, and then the inadequacy of the simple genetic algorithm used for the planning has been discussed and then a modified algorithm has been suggested.
为了满足日益严峻的电网调峰问题,首先在中期发电扩展规划模型中引入峰谷差约束,然后讨论了应用于发电规划的简单遗传算法的不足,并提出了一种改进的遗传算法,该算法能根据父代群体质量动态调整控制参数从而有效地改善了算法收敛速度和最优解。
2) generation investment and planning
发电投资与规划
3) Heuristic transmission network planning
启发式电网规划
4) power generation expansion planning
发电扩展规划
1.
A basic mathematical model for least-cost power generation expansion planning is provided firstly.
给出了发电扩展规划的基本数学模型。
6) long range generation planning
长期发电规划
补充资料:水力发电规划
水力发电规划
hydropower planning
衔接的梯级开发方案f见图2)。 !…_E IN 一 皑 恒…一 ’┏━┳━━┳━━┳━━┳━━━━━━━┳━━━━┳━━┳━━━━━━━┳━┳━━━━┳━━━━━┳━┳━━━┓┃ ┃、 ┃ ┃ 1 ┃ l ┃ 1 ┃ ┃ I; ┃ ┃ 净 ┃ H_卜 ┃ ┃ } ┃┣━╋━━╋━━╋━━╋━━━━━┳━┻━━━━┻━━╋━━━━━━━╋━┫ ┃ ┃ ┃ ┃┃ ┃ ┃、 ┃ ┃ l ┃ j - ┃ 1{ ┃ ┃ ┃ jf㈠ ┃ ┃ } ┃┃ ┃ ┃ ┃ ┃ ┃ 1 c、他 翮 ┃ ┃ ┃ ┃ ┃ ┃ ┃┃ ┃ ┃ ┃\ ┃ ┃ l I i ┃ I 1 ┃ ┃ ┃ ┃ ┃ ┃┣━╋━━╋━━╋━━╋━━━━━┫ ┣━━━━━━━╋━╋━━━━╋━━━━━┻━╋━━━┫┃ ┃ ┃ ┃ ┃ 、 ┃ ┃ ┃ ┃ ┃.一J——L』 ┃ ┃┃ ┃ ┃ ┃ ┃一—— ┃懦一 ┃ ┃ ┃ ┃ ┃ ┃┃ ┃ ┃ ┃ ┃ ┃ ┃ ┣━┻━━━━╋━━━━━┳━╋━━━┫┃ ┃ ┃ ┃ ┃ — u ┃’≮蚌 ┃ 14 11 L~ ┃j面{ ┃ ┃ ┃ ┃┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ l i ┃ { I ┃ ┃ ┃┣━╋━━┻━━╋━━╋━━━━━╋━━━━━━┳━━┻━━━━━━━╋━━━━━━╋━━━━━┫ ┃ ┃┃ ┃ ┃ ┃ ┃ l ┃ r牛 ┃型二.1。一 ┃..Llj L ┃ ┃ ┃┣━╋━━┳━━╋━━╋━━━━━╋━┳━━━━╋━━┳━━━━━━━╋━━━━━━┻━━━━━┫ ┣━━━┫┃ ┃ ┃ ┃ ┃ ┃ ┃ 1 ┃ ┃ l ’ ┃q遗爿。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条