说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 填筑措施
1)  Measures of filling
填筑措施
2)  filling measure
填料措施
3)  replacement and refilling measures
换填措施
4)  filling construction
填筑施工
1.
The paper introduces the application of GPS in supervision,communication,positioning of filling construction of concrete face rockfill dam,some problems that should think in composition of supervision center and foundation of the system, as well as related soft wares.
介绍了全球定位系统在混凝土面板堆石坝填筑施工中监控、通讯、定位过程中的应用,以及监控中心的组成和建立系统时应考虑的问题,最后介绍了监控系统软件和数据通讯系统软件。
2.
According to the quality control needs of filling construction of the face rockfill dam, by means of the global satellite positioning technology, the wireless data communication technology, the computer technology and the data processing and analysis technology, and integrating with the roller compaction machine, the GPS real-time supervisory system is developed in this paper.
针对面板堆石坝填筑施工的质量控制需要,利用全球卫星定位技术、无线数据通讯技术、计算机技术和数据处理与分析技术,结合碾压机械进行集成,研制了一套GPS实时监控系统,可用于填筑工程碾压施工质量的实时监控。
5)  measure of building technology
建筑技术措施
6)  building energy efficiency measure
建筑节能措施
补充资料:不合格品纠正措施(见纠正措施)


不合格品纠正措施(见纠正措施)
corrective actions for nonconforming product:see corrective actions

bul,卯ping jiuzhe叫euoshi不合格品纠正措施(~tive actions for non-印雨皿吨prt泪uct)见纠正措施。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条