说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 超前固结灌浆
1)  advance consolidation grouting
超前固结灌浆
2)  Consolidated grouting
固结灌浆
1.
testing method and technology of consolidated grouting in site are introduced and obtained test date are analyzed,design parameters are drawn for consolidated grouting under construction.
介绍了清江水布垭电站在运行水头高、灌浆盖重轻、层状岩体倾角平缓、岩溶构造发育等不利条件下,现场固结灌浆的试验方法与工艺,并对试验数据进行分析,得出了固结灌浆施工必需的设计参数,为复杂条件的固结灌浆积累了经验,供同类大型工程固结灌浆时参考。
3)  consolidation grouting
固结灌浆
1.
Fast construction technique of consolidation grouting applied in deep overburden under special geological conditions;
特殊地质条件下深覆盖层固结灌浆快速施工技术
2.
Research on consolidation grouting techniques in Shuibuya hydraulic engineering project;
水布垭水利工程基岩固结灌浆工艺的研究
3.
Quality control for foundation consolidation grouting without concrete covering at right bank dam of TGP;
三峡右岸大坝基础无盖重固结灌浆质量控制
4)  Pre-consolidation Grouting
预固结灌浆
1.
The Application of Pre-consolidation Grouting Technology in Yujiang Diverting Water Diversion Tunnel Project;
预固结灌浆技术在郁江调水引水隧洞工程中的应用
5)  anchoring and consolidation grouting
锚固与固结灌浆
6)  Primary,secondary CGH
1,2-期固结灌浆孔
补充资料:固结灌浆
      为改善节理裂隙发育或有破碎带的岩石的物理力学性能而进行的灌浆工程。其主要作用是:①提高岩石的整体性与均质性;②提高岩石的抗压强度与弹性模量;③减少岩石的变形与不均匀沉陷。对混凝土重力坝,多进行坝基全面积固结灌浆;对混凝土拱坝或重力拱坝,还要对受力较大的坝肩拱座岩石进行固结灌浆;对水工隧洞,常在衬砌后进行岩石固结灌浆。在破碎的岩层中开挖隧洞时,为避免岩石坍塌或集中渗漏,可在开挖前进行一定范围内的斜孔或水平孔超前固结灌浆。在土石坝防渗体底部设置混凝土垫层时,也常对垫层下部岩石进行固结灌浆。为保证灌浆质量,需在岩基表面浇筑混凝土盖板或有一定厚度的混凝土后才进行固结灌浆。
  
  岩石地质条件复杂时,一般先进行现场固结灌浆试验,确定技术参数(孔距、排距、孔深、布孔形式、灌浆次序、压力等)。浅层固结灌浆孔多用风钻钻孔;深层孔多用潜孔钻或岩心钻钻孔。平面布孔形式有梅花形、方格形和六角形。排距和最终孔距一般为3~6m,按逐渐加密方法钻灌。灌浆材料以水泥浆液为主,在岩石节理、裂隙发育地段,吃浆量很大时,常改灌水泥砂浆。灌浆时先从稀浆开始,逐渐变浓,直至达到结束标准。灌浆全部结束后,对固结效果的检查方法有:①钻检查孔进行压水试验和岩心检查;②测定弹性波速与弹性模量;③必要时开挖平洞或竖井直观检查。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条