1) ribbed tubular pile with enlarged base
扩大头带肋管桩
1.
This paper introduces manufacturing and construction methods of ribbed tubular pile with enlarged base, the process and methods of static load test and also analyzes the results of the test.
本文介绍了扩大头带肋管桩的制作和施工方法,介绍了它的静载荷试验过程和方法,并对实验结果加以分析;本文着重分析了扩大头带肋管桩的沉降机理,并构建了一个基于弹塑性理论的适用于扩大头带肋管桩的沉降计算模型。
2) sand-filled prestressed piping column
扩大头带肋填砂预应力管桩
1.
The research and Engineering applicant examples of sand-filled prestressed piping column with rib and enlarged bottom which is used in soft soil area are introduced.
介绍了在软土地区使用的扩大头带肋填砂预应力管桩的研究与工程实例,该桩型桩端扩大、桩身带肋、桩侧填砂能改良桩侧土层性质,大幅提高桩侧与桩端面积,还克服了管桩在软土地区施工出现的桩身上浮、偏位现象。
3) expansion pile head
扩大桩头
1.
Constructional technique and quality assurance of big bore hole digging and pouring with expansion pile head;
大孔径扩大桩头挖孔灌注桩施工工艺及质量保证
4) ribbed and sand-filled tube pile
带肋填砂管桩
5) ram extension pile
夯扩大头桩
1.
The characteristics of ram extension pile and soil compaction pile united ground improvement are compared with that of post grouting pile by rotary drilling and soil compaction pile;the influence of the loess collapsibility on bearing capacity of pile-foundation is analyzed.
对山西朔州某电厂夯扩大头桩与素土挤密桩和后压浆旋挖灌注桩与素土挤密桩2种地基处理方案进行全面分析对比,揭示了黄土湿陷性对桩基承载力的影响,并得出了优化地基处理方案,为以后湿陷性黄土地区桩基设计提供一些经验。
6) New type of prestressed piles with rib
新型带肋预应力管桩