说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 地连墙凿除
1)  diaphgram chiseling off
地连墙凿除
2)  underground continuous wall
地连墙
1.
This article discusses the reasons of leakage of the underground continuous walls of the arcade of car dumper house,the fifth project of Qinhuangdao Coal Harbor,and introduces the preventive measures in construction and the repair of leakage of underground continuous walls.
简要介绍了秦皇岛港煤五期工程翻车机房廊道地连墙发生渗漏情况、原因分析、堵漏方案方法及效果。
2.
How to predict the deformation of the support construction-underground continuous wall in the process of pi.
结合润扬长江公路大桥南汊北锚碇深基坑工程 ,提出并应用神经网络多步预测方法来研究地连墙施工变形的预测问题。
3)  diaphragm wall
地连墙
1.
The bending moment of the front wall and the rear anchored diaphragm wall,the earth pressure.
试验量测了前墙、锚碇地连墙的弯矩,前墙海陆两侧和锚碇地连墙海侧的土压力,同时还量测了拉杆力及前墙、锚碇地连墙顶端的水平位移。
2.
32 berths in Jingtang Harbour District,the concrete used at the design elevation of the diaphragm wall of-1.
京唐港区31#、32#泊位施工中由于地连墙设计高程-1。
4)  diaphragm retaining walls
地连墙
1.
The paper describes the construction of underground diaphragm retaining walls,which had to be executed in backfilled sand and stones,and had to cut through the rubble mound foundation for the caissons adjacent to the diaphragm walls.
文章阐述了地质情况为回填积砂石,且要求地连墙穿过相临沉箱的基床抛石的情况下进行地连墙施工,施工的重点与难点为地连墙成槽施工。
5)  Underground continuous wall
地下连续墙
1.
The common problems in the construction of underground continuous wall and the management;
地下连续墙施工中常遇问题及处理
2.
Research on the quality control points of underground continuous wall;
地下连续墙质量控制要点的研究
3.
Analysis of effect of different membership function on calculation of fuzzy reliability in underground continuous wall;
不同隶属函数对地下连续墙模糊可靠度影响的分析
6)  diaphragm [英]['daɪəfræm]  [美]['daɪə'fræm]
地下连续墙
1.
Construction techniques of diaphragms under special conditions;
特殊条件下地下连续墙的施工技术
2.
Based on the analysis of a certain retaining and protecting for deep foundation excavation,several structural schemes including piles in row,bracing system,soil nailing wall and diaphragm are compared.
结合深基坑支护实例,进行了排桩、内支撑、土钉墙、地下连续墙等多种支护方案的技术、经济比较,阐述了软土深基抗土钉墙支护结构的设计方法。
3.
This paper presents the concept of dynamic strength reliability and dynamic rigidity reliability of retaining diaphragm during construction.
提出了支护结构多支撑挡土墙施工过程“动态强度可靠度”和“动态刚度可靠度”的概念 ,研究了基于Monte Carlo法的多支撑挡土墙动态可靠度计算方法 ,并详细分析计算了润扬长江公路大桥南汊悬索桥北锚碇基坑施工过程中嵌岩地下连续墙的可靠度变化。
补充资料:除墙屋
1.指清除墙屋中的虫豸。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条