1) electric power project
火力发电项目
1.
This paper analyses the market environment faced by Haibowan electric power project and studies the forecast of power demand and the evaluation of its development sustainability.
4、建立了基于火力发电项目-区域环境-区域社会的协调度的评价电厂建设项目持续发展能力的科学、有效、全面的指标体系。
2.
This paper analyses the market environment faced by Leiyang electric power project andstudies the forecast of power demand and the evaluation of its development sustainability.
6、建立了火力发电项目-区域经济-区域环境的协调度模型。
2) wind power project
风力发电项目
1.
Application of risk management to wind power project;
风险管理在风力发电项目中的应用
3) thermal power project
火电项目
1.
Surrounding the project Approval System Making thermal power project planning
围绕项目核准制 做好火电项目规划
2.
Aiming at the peculiarity of declaration including much tache and dealing with extensive matter in thermal power project at approval stage, the key factors that effect on the project quality was analyzed in this paper, and the significance of strengthening management during thermal power project approval stage was also indicated.
针对火电项目核准阶段申报环节多和涉及内容广的工作特点,文中分析和提出影响项目核准阶段工作质量的几个关键问题,并指出加强火电项目核准阶段工作管理的重要性。
3.
In order to control and reduce the engineering cost of power plant the author has analyzed comprehensively 8 typical thermal power projects in Anhui province in view of total engineering investment, unit engineering cost, unit price of main equipment, economic benefits after commissioning of the project and loan repayment of the projects.
为控制和降低电厂工程造价 ,从工程总投资、单位工程造价、主设备单位造价、项目投产后经济效益状况、项目还贷能力等方面 ,对安徽省 8个典型火电项目进行了综合分析。
4) fire power project
火电项目
1.
Economic benefits post-evaluation for fire power project is important part of post-evaluation of fire power project.
火电项目经济效益后评价是火电项目后评价工作的重要内容,它是以火电项目建成投产后的实际数据为基础,计算分析各项经济效益评价指标,为火电企业生产经营提供经济与财务决策依据,并为同类项目的决策和建设提供参考。
5) power project
电力项目
1.
This paper introduces how Longyuan Power Group Company successfully carried out foreign debt financing for Jiangsu s power projects through its overseas financing window-Xiongya (Virgin) Co.
介绍龙源电力集团公司如何通过自己的境外融资窗口——雄亚(维尔金)有限公司,为江苏省电力项目成功完成外债融资。
2.
The practice for the assets appraisal of a certain power project indicates that "Control Indexes for quoted design of thermal power,power transmission and distribution engineering" issued annually by the State Power Corporation is an important criterion to examine whether the results of power assets appraisal is reasonable and reliable.
某电力项目资产评估的实践表明 :国家电力公司每年颁发的《火电、送电、变电工程限额设计控制指标》是考核电力资产评估结果是否合理、可靠的重要依据 ;电力资产评估应贯穿系统工程的思路 ;要注意更新重置成本的选择与功能性贬值的量化 ;应正确掌握进口设备资产评估的替代法
3.
With the matureness of technology on the method of project evaluation,Qinghai Power Company puts forward a clear guiding method on power project post-evaluation.
当前项目评价方法日趋成熟,青海省电力公司对电力项目后评价也提出了明确的指导办法。
6) Industrialization of Zhuzhou Southern Wind Power Generator
风力发电机产业化项目
补充资料:火力
火力
firepower
夜间对空射击huoli火力(fireP0wer)弹药经发射、投掷后形成的杀伤力和破坏力。是歼灭敌人的主要手段。按武器种类分为常规火力和核火力;按打击目标所处位置分为对地面火力、对海面火力和对空火力;按兵种分为步兵火力、坦克兵火力、炮兵火力、防空兵火力、战役战术导弹部队火力、航空兵火力和舰艇部队火力等。灵活运用各种火力,使其发挥最大效能,对夺取作战胜利具有重要作用。 火力随着火药用于军事而产生,随着火器的改进而发展。10世纪,中国出现燃烧性和爆炸性火器后,在作战中开始运用火力。14世纪末,滑膛枪、滑膛炮用于作战后,火力的作用增大。19世纪中叶,后装线膛枪炮广泛运用于战场后,火力逐渐成为决定战斗胜负的重要因素。第一次世界大战时期,坦克、飞机使用于战场,火力种类增多,杀伤力、破坏力增大,诸兵种的火力紧密结合,形成纵深、立体火力。第二次世界大战以后,坦克、飞机、火炮的改进并大量使用,核武器、精确制导武器的出现,火力的杀伤力、破坏力空前增大,并成为歼灭敌人的主要手段。 通常根据任务、武器性能和地形条件组织火力。火力运用需集中、突然、迅速、准确和猛烈。基本要求:①按各种火器的不同性能,合理区分与编组,疏散隐蔽地配置,正确赋予任务。②集中主要火力于主要方向,协同一致地打击主要目标。③统一计划,形成远中近、高中低、全纵深、全方位的火力,使火力、机动、突击相结合。④广泛实施火力机动,在决定性的方向和时机,造成并保持对敌火力优势。 作战中,需统一计划各兵种的火力,周密组织对地面火力、对海面火力、对空火力。步兵和坦克兵的火力,通常在炮兵和航空兵火力掩护、支援下,与突击和机动相结合杀伤敌人。炮兵火力,通常按照计划采取集中射击、拦阻射击等方法,为步兵、坦克兵的行动创造条件。防空兵火力,通常按被掩护目标和任务,构成点、线、区域相结合的高、中、低、超低空对空火网,保障部队的上空安全。战役战术导弹部队火力,在重要时节对重点目标实施突击,支援己方部队行动。航空兵火力,主要以强击、轰炸等方法,压制、摧毁重要目标,支援地面部队作战。舰艇部队火力,主要以舰炮、鱼雷、深水炸弹、导弹攻击水面、水下和空中目标,在登陆作战中攻击陆上目标,支援登陆兵行动。 随着高技术武器装备的发展,未来作战将更加注重火力的精度和强度,充分发挥各种火力的综合效果。(李之遇)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条