说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 油房沟水电站
1)  Youfanggou Hydropower Station
油房沟水电站
2)  Shuanggou water power station
双沟水电站
1.
Discharge ice in construction period and discharge ice measures in Shuanggou water power station;
双沟水电站施工期过冰及渡凌措施
3)  Shagou Hydropower Station
沙沟水电站
1.
As the topographic condition is limited,the conventional energy dissipating mode can not meet the relevant requirements of Shagou Hydropower Station,a tank-type energy dissipator is suggested to be used there;for which,there is no existed experiences for the desi.
沙沟水电站受地形条件限制,采用常规的消能方式满足不了要求,故采用箱式半压力消能工。
4)  hydropower house
水电站厂房
1.
Simulation analysis of temperature control on hydropower house monolith of some water power station in river channel;
某河床式水电站厂房坝段温控计算分析
2.
Application of air change ventilation system in hydropower house;
置换通风系统在水电站厂房中的应用
3.
As a special load,seismic shock can directly influence the design of hydropower houses.
以三峡左岸水电站厂房为例,依托现行的抗震设计规范考虑混凝土材料的开裂,采用人工地震波生成技术和时程分析方法对整个地震过程中的厂房结构地震响应进行研究。
5)  hydropower plant
水电站厂房
1.
Especially, the vibration induced by fluctuating pressure in the tunnel of hydropower plant is worthy of investigation.
随着水电事业的不断发展,电站单机容量和厂房尺寸不断增大,由此可能引发的水电站厂房结构的振动问题非常令人关注,特别是厂房流道内的脉动压力引起的结构振动值得研究。
2.
This paper described the feasibility and disadvantages of PKPM application for the structural design of hydropower plants with the transformation of existing load factor through differences with DL norms and GB norms,discussing how to more rational use of PKPM design soft to the structural design of hydropower plants.
通过DL规范与GB规范的差异比较,说明了现行荷载系数转化应用PKPM进行水电站厂房结构设计的可行性与其弊端,探讨如何更加合理的利用PKPM程序来进行水电站厂房结构设计。
3.
Hydropower Station plant is an important part of the building,due to design or construction of negligence resulting in leakage of water,which impact the use of hydropower plant function and life.
水电站厂房是水电站建筑物的重要组成部分,因设计或施工方面的疏忽而造成渗漏水,影响水电站厂房的使用功能和使用寿命。
6)  powerhouse of hydropower station
水电站厂房
1.
In this paper, applications of concrete filled steel tube (CFST) in the powerhouse of hydropower station are mainly discussed.
水电站厂房的特点是跨度和高度大、吊车起吊重量大,吊车立柱的基础为机组的钢筋混凝土支承结构,机组振动对厂房结构影响明显。
补充资料:水电站油系统


水电站油系统
oil supply system of hydropower station

shuld旧nzhon you水电站油系统Power station)沉J long(011 supply system of hydro-为满足水电站机电设备的用油、排油要求,由油泵、油罐、油处理设备、油吸附设备、油化验设备以及相应管网、阀门、测量和控制元件等组成的系统。一般水电站油系统具有透平油系统、绝缘油系统和油化验等3个相对独立的部分。 透平油系统为水轮发电机组的各轴承提供润滑油,为水轮机调速器、进口间的油压装1提供操作用油,两项用油一般均统一采用运动猫度为20~32mm“/s的透平油,其系统由油处理室及滤油机、油库及油堆等组成。 净油雄的容积应满足一台最大用油机组需油量的110%,油雄的数量应满足净油、污油的存放以及油的处理、更换等需要,压力滤油机和真空滤油机用于去除杂质和水分,以真空滤油机的脱水效果较好。 透平油库和油处理室多布置在厂房底层的专用房间内,人工操作,室内要视容量设水喷雾灭火和通风排烟设备。 绝缘油系统主要供给变压器、油断路器等电气设备用油。其功能、设备以及系统配置均与透平油系统类似.绝缘油库多为露天布置,油处理室设在厂外专门房间中,室内设水喷雾灭火和通风排烟设备。 油化验的主要任务是:对新油进行分析化验,按国家标准鉴定;对运行油定期取样化验,判断是否需要处理。水电站一般配置简化分析化验设备。 中小型水电站用油量少,油系统可简化。对梯级水电站,多在适当位置建立中心油务所,其贮油和油净化设备按梯级水电站中最大一台机组或变压器的用油量配置。中心油务所的油化验设备一般按全分析项目配置。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条