说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 产品材料工艺定额
1)  The Product quota of material consumption in processing
产品材料工艺定额
2)  the material dissipative technologic-ration
原材料消耗工艺定额
3)  process ration
工艺定额
1.
This article has described the function and establishment method of the material consumption process ration,and the effect of the blank material selection on the ratio has been illustrated as well.
介绍了材料消耗工艺定额的作用和制定方法,并举例说明了毛坯选择对材料消耗工艺定额的影响。
4)  material quota
材料定额
1.
It is an important component of CAPP that the material quota is calculated.
材料定额计算是CAPP系统的重要组成部分。
2.
S1-CAMQM system is a computer aided material quota management system.
S1-CAMQM系统是计算机辅助材料定额管理系统,在该系统中,将先进的专家理论和方法运用于零件材料定额设计的具体工程实践中,解决了零部件专业化和成组加工制造环境下零件材料定额设计的正确性和一致性问题。
3.
It s convenient to work out material quota using the Microsoft Excel Program,which can reduce the cost of the project and shorten the time limit for the projec
利用微机Excel表格处理软件编制材料定额 ,方法简便易学 ,适用于材料定额编制工作 ,能更好地降低工程成本 ,缩短工期。
5)  Material ration
材料定额
1.
Material Ration is the key to corporation s production.
材料定额是企业生产的关键 ,这里分析了材料定额的工作特点 ,提出了基于C/S模式的面向CIMS环境的材料定额管理系统。
2.
In the material ration process of using computer software,how to estimate material ration of oneself and the comparision of the same parts are introduced.
介绍了在利用计算机作材料定额的过程中,如何判断自己所作部件的材料定额的利用率以及和同类部件的利用率相对比,从而判断自己所作部件的材料定额利用率的高低。
6)  Raw material industry
原材料工业产品
补充资料:施工企业材料消耗定额


施工企业材料消耗定额
quota of material consumption in construction enterprise

shigong qiye eailiao xiaohao dinge施工企业材料消耗定颊(quota of materia-eonsumPtion in eonstruetion enterPrise)在一定条件下,施工企业完成单位工作量合理消耗材料的数量标准。它由有效消耗、施工损耗和管理损耗三部分构成。(1)有效消耗指构成工程实体的净用量;(2)施工损耗指施工过程中操作、下料的损耗;(3)管理损耗指在运输、保管过程中的损耗。 材料消耗定额分预算、施工和概算材料消耗定额三种。(1)材料消耗预算定额。在确定一个计量单位的分项工程基础上,由有效消耗、施工损耗和管理损耗组成。(2)材料消耗施工定额。在确定一个计量单位的分项工程基础上,由有效消耗和施工损耗组成。(3)材料消耗概算定额。根据历年来同类工程结构材料消耗量的统计资料,经整理分析而制定的经验型综合定额。 (刘和卿)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条