1)  refusal
拒锤
1.
Due to the harsh environmental conditions in ocean engineering,intermissions occur during the driving of large diameter and deep penetration piles,which may cause difficulties,even refusal,in re-starting the pile.
受到海上施工条件的限制,特别是大直径超长桩的施工常出现停锤,停锤后继续打桩时,连续打桩引起的桩周地基土中的超静孔隙水压力消散,土体强度得到恢复和提高,使得打桩阻力增大,甚至出现拒锤现象。
2)  driven pile refusal
打桩拒锤
补充资料:揲揲锤锤
1.象声词。促织的叫声。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。