说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 昆明新机场
1)  Kunming new airport
昆明新机场
1.
Application of Digital Measurement in Kunming New Airport Construction
数字化测量在昆明新机场项目中的应用
2.
Application of Simulation Assembly Technology for Steel Structure in Kunming New Airport Terminal
昆明新机场航站楼钢结构模拟拼装技术应用
3.
Kunming new airport will found in Xiaoshao town in Guandu and Libaichong, Hunshui pond in Daban town, which is about 24km far from Kunming.
昆明新机场拟建于昆明东北方向官渡区小哨乡与大板桥乡之间的李白冲、浑水塘一带,距昆明市约24km。
2)  the new Kunming Airport
昆明新机场
1.
The central area in front of the terminal building in the new Kunming Airport uses isolation system with large rubber isolation bearing which has been installed successfully.
昆明新机场航站楼前中心区采用了大型隔震橡胶支座隔震体系,目前已完成安装施工。
2.
The site area of the terminal building in the new Kunming Airport is about 150 thousands square meters.
昆明新机场航站楼占地面积约15万m2,基础采用人工挖孔灌注桩,局部采用天然地基。
3)  Kunming airport
昆明机场
4)  Modern new Kunming
现代新昆明
5)  new Kunming construction
新昆明建设
6)  Kunming telecommunications market
昆明电讯市场
补充资料:新首都机场
新首都机场
新首都机场

主航站楼工程是首都机场扩建工程的核心部分,位于首都机场东跑道东侧。是具有世界一流功能和特色的现代化超大型航空枢纽,建筑面积为28万平方米,地下两层,地上5层,建筑高度45米,结构类型为钢筋混凝土及钢结构设计,标段总价为48亿元人民币。

位于北京市郊顺义县天竺镇首都国际机场内,工程建筑面积33.5万平方米占地面积约10万平方米,建筑物平面呈“工”字型,南北长747米,南北指廊东西宽343米,中央大厅东西宽121米,单层面积达9万平方米。

新航站楼的南、北、东侧共设有36个登机桥,可同时停靠36架飞机。楼内设自动步道、自动扶梯、配有168个办票柜台、设有行李自动分检、安全检查、楼宇自动化控制、内部通讯等先进的机场管理系统。

据悉,工程将于28日破土动工,2007年9月建成。根据设计规模,到2015年,新航站楼可满足年旅客吞吐量3500万人次的需要。届时,扩建后的首都机场年旅客吞吐总量可达到6000万人次,货邮吞吐量180万吨,飞机起降50万架次,高峰时每小时飞机起降124架次。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条