1) Surface water Model System
地表水模型系统
1.
In the paper, a method combining Surface water Model System (SMS) & Remote Sensing (RS) is suggested with the example of the simulating result and water environment capacity in Fuzhou Section of Minjiang River , especial detailing the simulation of SMS of water environment of Minjiang River and the testify with RS.
本研究以闽江福州段的水质模拟结果和水环境容量计算为例,提出了地表水模型系统(Surface water Model System,即SMS)及遥感(Remote Sensing,简称RS)技术相结合的方法,着重阐述了SMS对闽江福州段的水环境模拟过程及应用遥感技术进行验证的过程。
3) Surface water modeling system
地表水模拟系统
4) simulating model of ground water system
地下水系统模拟模型
5) surface water heat pump system
地表水热泵系统
1.
Experimental analysis on cleaning methods of heat pump units in surface water heat pump systems;
地表水热泵系统热泵机组换热器清洗方式的实验分析
6) surface water treatment system
地表水处理系统
补充资料:地表水取水构筑物勘察
地表水取水构筑物勘察
investigation of surface water catchment structure
为:管坯约2.1~1.15t,燃料约2.7~3·IGJ,电力约surfaee water eatehment strueture)为地表100~nokw·h。水取水构筑物的设计和施工而进行的工程地质勘察。 (宋本仁)地表水一般是工业生产和生活用水的主要水源。地表 水取水构筑物常设置在江河岸边或伸入河床中(见dibiao Shui qushui gouzhuwu kanCha图),其基础埋深受江河最低水位或最大冲刷深度控地表水取水构筑物勘察(investigation of制,通常埋深较大。架含分j母一 地表水取水构筑物示意图 。一河床式取水构筑物,1一取水失部,2一自流管;3一进水孔 b一岸边式取水构筑物;1一集水井;2一水泵房;3一闸阀井 勘察阶段与设计阶段相适应,一般分为选址勘察阶段、初步勘察阶段和详细勘察阶段。 (l)选址勘察。以搜集已有地形地质、气象水文资料和现场踏勘为主,重点调查:河段形态、流态特征,河曲变化趋势,岸坡形态和稳定性,毗邻的山坡是否稳定,有无威胁场地安全的冲沟和泥石流,水位变化幅度,河床冲淤情况等。对拟建场地的适宜性和稳定性作出初步评价,推荐最优场址方案。 (2)初步勘察。以工程地质测绘、工程地质勘探、试验为手段,重点查明:地质构造,地基土的构成、岩性,岩土的物理力学性质,地下水条件,地层的渗透性,有无软土、流砂等不良地层及其分布,不良地质现象的发育程度等。为总图的布置、构筑物选型、施工方法选择提供可靠的工程地质资料。勘探线和勘探点间距,根据地质条件和构筑物特点确定。勘探深度在河床区要达到最大冲刷深度以下3一sm,在岸边区要达到最低水位以下s~lom。 (3)详细勘察。以勘探、试验为主,为取水构筑物的设计、施工和防治措施提供详细的工程地质资料和设计所需的岩土计算参数;预测施工降水产生涌土、流砂的可能性;对于用沉井施工的工程,还要评价地层的均匀性,并根据地质条件提出地基处理、施工方法和防治不良地质现象的建议。 (何匆,1).。目J,二二才.、*、,二。J,。二、二.二、·,~。、~·。~
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条