1) Circulating desulfurization
循环脱硫
2) desulfurization liquid
脱硫循环液
1.
This not only affected efficiency of desulfurization but also influenced normal production because of desulfurization liquid poured regularity.
为此,不得不定期外排脱硫循环液。
4) CFB desulphurisation
循环流化床脱硫
1.
Technical and eco-nomical compare is given between the project of CFB desulphurisation and pulverized-coal-fired boiler plus damp-dry FGD process,and sugestions are given for the selection of desulphurisation process combinded with the specific conditions of ther-mal power plant expanding construction project.
简要介绍了循环流化床脱硫技术和几种烟气脱硫技术工艺的特点,结合电厂扩建工程的实际情况,对循环流化床锅炉脱硫和煤粉炉加半干法烟气脱硫技术方案进行了技术经济比较,对脱硫技术方案的选择给出了建议。
5) circulation half dry desulphurization system
循环半干法脱硫
1.
Problems in the circulation half dry desulphurization system from t he operation are analyzed, the problems of falling ash from the reactor were sol ved.
分析了循环半干法脱硫系统在运行中出现的问题,通过调整操作运行,解决了脱硫系统的反应器落灰问题。
6) FGD wastes recycle
脱硫渣再循环
补充资料:循环系统的进化鱼的循环系统
李瑞端绘
[图]
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条