1) risk of flood handling during construction period
施工度汛风险
2) flood handling during construction period
施工度汛
1.
In order to analyze the risk factors of flood handling schemes during construction period of Gongboxia Hydropower Station,the risk analysis methods are discussed and the factors which affect the flood handling during construction period of Gongboxia Hydropower Station are analyzed.
通过分析公伯峡水电站施工度汛风险的影响因素,选定主要影响因素为龙羊峡水库入库的洪峰流量,对龙羊峡水库不同运行方式下公伯峡水电站的施工度汛方案,采用概率分布函数计算风险率法进行了风险分析。
4) construction risk
施工风险
1.
Fuzzy synthetic evaluation on construction risk of EPBS during tunnelling in soft soil area;
软土地区土压盾构隧道掘进施工风险模糊评估
2.
The paper focus on the study on museum construction risk identification,and research on the application of museum construction risk identification from 4 aspects,which are objects,basis,methods and process.
着手于博物馆建设项目风险识别的研究,在其研究必要性的基础上,从风险识别的目标、依据、方法、程序等方面研究并构建了博物馆建设项目施工风险识别的实施方案,并用专家调查法对东莞科技博物馆建设项目进行了实证研究,研究结果为博物馆建设项目的风险识别提供了必要的参考和依据。
5) safety of flood control during construction period
施工度汛安全
6) construction during flood period
施工渡汛
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条