2) cast in situ bored pile
钻孔压灌桩
1.
As for their foundation,four of them were fortified by the long bolt cast in situ bored piles.
太原市滨河小区是市重点工程 ,共 10栋高层住宅 ,其中 4栋住宅地基处理采用长螺旋钻孔压灌桩。
3) cast?in?place plain concrete pile driven by auger rig
钻孔压灌素砼桩
1.
Introducing the first application of composite foundation with cast?in?place plain concrete pile driven by auger rig in Beijing, comparing it with prefabricated reinforced concrete piled foundation and other composite foundation,analyzing it from the aspects of economics,technique,construction and project time.
通过和预制桩基础及其它复合地基在经济、技术、施工、工期等方面的比较分析 ,钻孔压灌素砼桩被建设单位选中 ,1 997年 3月首次应用于北京望京电信局机房楼 (一段 )工程。
4) bored grouting pile
钻孔压浆灌注桩
1.
By discussing executing process of bored grouting pile, the paper points out reasons and preventive measures of quality problems.
通过钻孔压浆灌注桩施工工艺的论述 ,指出了产生质量问题的原因及防治措施。
5) technology of boring cast-in-place under pressure
钻孔压灌工艺
1.
Fly-ash concrete pile and technology of boring cast-in-place under pressure were introduced at first.
介绍了粉煤灰混凝土桩及钻孔压灌工艺的特点 ,指出了粉煤灰混凝土桩钻孔压灌工艺在软土地基施工中应注意的问题 ,并列举了 2个工程实例。
6) the composite subgrade
钻孔压灌CFG桩
补充资料:冲击波超压与动压