1) field Q(a~(1/s))
域Q(a~(1/s))
2) Q-S curve
Q-S曲线
1.
Analysis of Q-S curve on negative frictional pile under large-scale vertical loads;
受大面积堆载影响负摩擦桩的Q-S曲线分析
2.
According to this characteristic,we may analysis pile body frictional resistance situation through the Q-S curve indirect,Compared to the case complex pile body stress observation,t.
通常情况下桩身摩阻的分析需要借助桩身应力观测,但对于摩擦型的长桩在非极限荷载的情况下,其荷载的作用增量基本转化为桩身的摩阻增量,且荷载的作用深度是渐进的,根据这一特征可以通过Q-S曲线间接分析桩身摩阻的变化情况,相对于复杂的桩身应力观测而言,该方法不失为一种较经济的分析手段。
3.
For the purpose of improving the rationality and reliability of pile design,on the basis of analyzing the characteristic of pile s static load Q-S curve,a "one element multi item format" is adopted to fit and predict a pile s Q-S curve.
为了使桩基设计更加合理可靠,在分析桩基静载试验Q-S曲线性质的基础上,采用一元多项式对桩基的Q-S曲线进行拟合及预测。
3) Q~'s Curves
Q~S曲线
4) Q-s curves
Q-s曲线
1.
The results show that Q-s curves calculated and measured are close to each other.
可以发现计算与实测的Q-s曲线非常接近;墩底端阻力的发挥严重滞后于墩侧摩阻力,墩顶荷载主要由端阻力承担,属摩擦端承型;扩大头侧面与土体接触处产生裂缝,裂缝首先在侧面下部产生,随荷载增加逐渐向上发展直至贯通,最大裂缝宽度达4。
2.
The study then starts with the calibration of single pile by analyzing the possible reasons to induce the difference between the measured and calculated Q-S curves.
先对一根试验桩进行验证计算,分析计算Q-S曲线与实测Q-S曲线存在差别的原因,然后对38根不同嵌岩深度和不同桩径的泥岩桩进行计算,模拟出泥岩桩的Q-S曲线和Q-z曲线,并对其统计分析,进一步论述了泥岩桩的荷载传递过程及其承载性状。
5) Q-S synchronization
Q-S同步
1.
Q-S synchronization of diverse structure chaotic systems based on backstepping method;
基于反步法的异结构混沌系统Q-S同步
6) Tobin's Q Ratio
Tobin s Q值
补充资料:超导电性的局域和非局域理论(localizedandnon-localizedtheoriesofsuperconductivity)
超导电性的局域和非局域理论(localizedandnon-localizedtheoriesofsuperconductivity)
伦敦第二个方程(见“伦敦规范”)表明,在伦敦理论中实际上假定了js(r)是正比于同一位置r的矢势A(r),而与其他位置的A无牵连;换言之,局域的A(r)可确定该局域的js(r),反之亦然,即理论具有局域性,所以伦敦理论是一种超导电性的局域理论。若r周围r'位置的A(r')与j(r)有牵连而影响j(r)的改变,则A(r)就为非局域性质的。由于`\nabla\timesbb{A}=\mu_0bb{H}`,所以也可以说磁场强度H是非局域性的。为此,超导电性需由非局域性理论来描绘,称超导电性的非局域理论。皮帕德非局域理论就是典型的超导电性非局域唯象理论。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条