1) lead correlation
超前相关
2) phase-lead control
超前相控
1.
Based on analyzing the lower power coefficient for the thyristor converter with phase-delay control,a thyristor converter with phase-lead control is constructed by introducing a forced commutative unit that consists of three-phase balancing inductor and capacitors.
本研究课题采用在主回路加入三相均衡电抗器和电容器组成强迫换流环节,从而构成超前相控变流系统。
3) phase advance
相位超前
1.
A carrier phase advance technique was developed to solve this problem.
提出采用载波相位超前技术消除其不利影响。
4) leading phase
超前相
5) phase lead
相位超前
1.
Islanding conditions and damages of PV grid-connected power system were analyzed;and then proposed basic principle and implementation procedure of phase lead anti-islanding detection method with inverter grid equivalent circuit according to islanding IEEE Std.
按照孤岛效应的国际通行标准,结合逆变器并网的等效电路给出了相位超前的反孤岛检测方法及其基本原理和实现过程。
6) leading-in phase
超前相位
补充资料:相关成本与非相关成本(relevantcostandirrelevantcost)
成本按其发生是否与决策项目相关的分类。相关成本是指与制定决策方案有关的联影响的成本,例如当期是否接受一批订货,生产该批订货需要花费的各种成本,即为相关成本。如该批订货是一种特殊订货,即其价格低于以前生产这种产品的完全成本时,其相关成本就是生产该批产品的变动成本。如果生产该批订货需扩大生产能力时,相关成本就既包括生产的变动成本,还包括添置设备等所需的其他成本。机会成本、差量成本、现金支出成本、可避免成本等均属相关成本。
非相关成本是指与制定决策方案并无影响的成本,因而在决策时可不予考虑。命名如接受特殊订货时,原有固定成本就属于非相关成本,因为即使不接受这批特殊订货,这些固定成本也会照样发生,当有几种方案可供选择时,各种方案都需发生的成本就是非相关成本,如采用不同的生产工艺组织生产时,构成产品实体的原材料在各种生产工艺过程中都要发生,所以这些原材料成本便是非相关成本。不可避免成本、沉落成本等属于不相关成本。
非相关成本是指与制定决策方案并无影响的成本,因而在决策时可不予考虑。命名如接受特殊订货时,原有固定成本就属于非相关成本,因为即使不接受这批特殊订货,这些固定成本也会照样发生,当有几种方案可供选择时,各种方案都需发生的成本就是非相关成本,如采用不同的生产工艺组织生产时,构成产品实体的原材料在各种生产工艺过程中都要发生,所以这些原材料成本便是非相关成本。不可避免成本、沉落成本等属于不相关成本。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条