1) large assembled steel sheet pile
大型组合钢板桩
1.
The paper describes the researches on the technologies for driving of large assembled steel sheet piles in Caofeidian Coal Terminal,selection of the final driving method and implementation of the selected method.
文章主要对曹妃甸煤码头大型组合钢板桩施工工艺的探索过程及最终方案的选择及方案的实施进行了论述。
2) "HZ"composite steel sheet pile
"HZ"组合型钢板桩
3) large scale steel stake
大型钢板桩
1.
By making use of combat readiness boat & bridge equipment in the construction of Tianjin rainbow bridge, the construction technique, the key points ,main performance of equipment ,quality control of large scale steel stake cofferdan quality are introducd.
介绍了天津彩虹特大桥利用战备舟桥器材在深水插打大型钢板桩围堰的施工工艺流程及各工序操作要点、配套设备的主要性能和施工质量控制 ,并对其施工优越性做了阐
4) combined large steel model
组合大钢模板
5) large piece of built-up steel formwork
大片组合钢模板
6) steel combined model
钢制组合大模板
1.
On the design and application of the steel combined model
钢制组合大模板的设计及应用