1) the construction and operational processes
施工、运行过程
2) construction process
施工过程
1.
The environment protection in basic construction process;
基础施工过程中的环境保护问题
2.
Numerical analysis of construction process for four-lane section tunnel;
高速公路特大断面隧道施工过程数值分析
3.
Experimental research to influence of shrinkage and creep during construction process;
施工过程混凝土收缩徐变的试验研究
3) constructing process
施工过程
1.
5 Subway as an example,the 3-dimention numerical imitation of the constructing process is calculated with the 3D-σ finite element program.
针对浅埋暗挖中洞法的施工特点,结合北京地铁五号线天坛东门站工程,利用3D-σ有限元计算程序对其施工过程进行三维数值模拟,通过计算结果数据的整理与分析,总结了浅埋暗挖中洞法施工引起的地表沉降规律,得出中洞开挖、临时支撑拆除和二次衬砌施工是中洞法施工中对地层扰动较大工序的结论,并对今后类似施工提出了建议。
2.
The constructing process and the loading course for engineering structures can be simulated well in their calculation by utilizing the existence function and the load function in the modern FE software.
利用有限元程序中针对对象的存在函数和作用函数功能,可很好地模拟工程结构的施工过程和加载路径,使计算结果更符合实际。
3.
At several constructing process of space structure and loading floor by floor, this paper studies the base s accumulative distortion effect of high building with bases of several properties and the influence on the internal force and distortion of upper structure.
研究了不同弹性地基上高层建筑,按空间结构任意施工过程荷载逐层加载时,地基的累积变形效应对上部结构内力及变形的影响。
4) construction
[英][kən'strʌkʃn] [美][kən'strʌkʃən]
施工过程
1.
The application of project management in construction;
浅谈项目管理在施工过程中的应用
2.
A finite element analysis was made on the effects of the construction on the internal force and deformation of reinforced embankment.
采用有限元方法分析了加筋路堤的施工过程对加筋路堤内力及变形的影响,通过算例证实,考虑施工过程后,填土的等效应力减少,而筋带应力增加,这一现象将随着路堤的增高表现得更加明显。
3.
Because the arch bracket is all subjected to the arch bridge construction load , its strength and stability is very important .
根据计算结果,对整个施工过程提出了重要的有价值的改进意见。
5) construction course
施工过程
1.
It analyzes inner force and deformation of large frame under vertical load in construction through ETABS, and puts forward analytic method for construction course of high-large frame.
通过ETABS这种商用软件,对巨型框架考虑施工过程在竖向荷载作用下的内力和变形进行了分析,提出了高层巨型框架模拟施工过程的分析方法。
2.
This article introduces construction control oi curtain for cutting off water of deep stirring pile in several aspeets which are construction organization, construction technology, construction course and so on.
主要从施工组织、施工工艺、施工过程等方面,介绍了深层搅拌桩用于上水帷幕施工时的监控内容。
6) construction procedure
施工过程
1.
The analysis of tall building frame structure considering influence of concrete shrinkage creep strain and construction procedure;
混凝土收缩徐变及施工过程影响的高层框架结构分析
2.
Mechanical analysis on construction procedure of shallow multi-arch highway tunnel
浅埋连拱隧道施工过程的力学分析
3.
Taking an overlong PC frame structure as example, the FE simulation of structure construction procedure are performed, prestressing restraint effect, seasonal temperature variation and concrete shrinkage & creep effects are considered.
以某体育场超长环形预应力混凝土框架结构为研究对象,进行了施工过程的有限元数值模拟,考虑预应力约束影响、季节温差、混凝土收缩徐变效应等。
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条