1) steel-pipe post pile
钢管立柱桩
1.
The exploding,underpinning,changing of support,dismantling temporary shoring,hole-sealing and well construction of steel-pipe post pile were introduced.
结合和泰大厦工程基坑双层密布混凝土支撑的拆除过程,阐述了支撑拆除的工艺流程,对钢管立柱桩破除、托换、换撑、拆撑、封井等工序进行了介绍,通过合理安排拆除顺序,确保了基坑安全及地下室施工的质量和顺利进展。
2) steel stud piles
钢立柱桩
1.
248 steel stud piles made reversely were designed to be used in Caoan Trade Buildings.
曹安商贸城设计逆作法施工钢立柱桩248根。
3) erect column pile
立柱桩
1.
With an analysis of how the multi-channel support beams affect the construction and investment in the semi-covered metro foundation pit,this paper discusses the cancellation of erect column piles in design and construction.
分析半盖挖(部分加盖挖土)地铁基坑施工中,多道支撑梁用立柱桩支承对施工和投资带来的影响。
4) vertical cylinder
直立桩柱
1.
Breaking wave forces on the vertical cylinders;
作用在直立桩柱上的破碎波浪力研究
5) flat-beam
扁钢立柱
补充资料:宝鸡石油钢管厂大口径薄壁钢管的φ508排辊成形机组
宝鸡石油钢管厂大口径薄壁钢管的φ508排辊成形机组
宝鸡石油钢管厂大口径薄壁钢管的中508排辊成形机组
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条