1) setting elevation
安装高程
1.
Determination of turbine setting elevation for Suzhi HPP;
苏只水电站水轮机安装高程的确定
2.
Taking the Laojiangdi Water Power Plant as for example,the method for calculating setting elevation of hydraulic turbine is analyzed.
以黄泥河老江水电站为例分析该类型水电站水轮机安装高程的计算方法,该类型水电站的特点是水头变幅大,而且运行水头主要取决于下游水位。
3) turbine setting
水轮机安装,水轮机安装高程
4) installation engineering
安装工程
1.
The main construction technology of installation engineering of sewage disposal plant;
城市污水处理厂安装工程主要施工技术
2.
Construction quality control of installation engineering in the reservation and embedded stage of high-rise building;
高层建筑安装工程预留预埋阶段的质量控制
3.
Discussion on construction technological explanation of installation engineering;
浅谈安装工程的施工技术交底
5) installation project
安装工程
1.
On the quality monitoring points of the installation project for electrical illumination
谈电气照明安装工程的质量监控要点
2.
The paper analyzed the cost conponent of the coal building installation project, discussed the main elements affecting the project cost, cutting down artificial cost, material cost, construction management cost is important means of cutting down project cost.
通过分析煤炭建筑安装工程的成本构成,阐述了影响工程成本的主要因素,指出了节约人工费、材料费、施工管理费是降低工程成本的重要手段。
3.
The key objective of bidding in installation project is to determine the comprehensive unit price in the Bill of Quantities pricing.
工程量清单计价中综合单价的确定,是安装工程项目投标报价的核心内容。
6) installation work
安装工程
1.
Supervision for the performing and carcasing is very important for the installation work.
建筑安装工程预留预埋阶段的监理工作非常重要,文章从安装角度分析了预留预埋阶段容易出现质量问题的原因,提出了建设监理控制的措施,为保证工程质量提供借鉴。
2.
In view of the quality problems existed in electric installation works of residences the causing reasons are analyzed; at the same time corresponding improvement measures are proposed.
针对目前住宅电气安装工程存在的问题 ,分析了电气质量问题产生的原因 ,提出了其改进措施 ,指出搞好电气安装工程质量管理工作尤为重
3.
Preset and embed is a part of the installation work in the construction of the high-rise building,whose quality will have a direct impact on the quality of the whole project.
高层建筑安装工程预留、预埋阶段是建筑工程中的一个有机组成部分,其施工质量的优劣直接影响着建筑工程的质量水平。
补充资料:水轮机安装高程
水轮机安装高程
installation elevation of water turbine
shu一IL一rl]1 orl之hLJor、9 gooeherlg水轮机安装高程(installation elevation ofwater turbine)为防止水轮机空化而确定的水轮机基准线的设置高程(见图)。该基准线,对于立轴反击式水轮机是导叶中心线高程;对于立轴冲击式水轮机是水斗中心线高程;对于横轴反击式及冲击式水轮机是主轴中心线高程。根据蜗壳和尾水管的尺寸,水轮机安装高程基本决定了主机间的基础开挖高程。 ┌──┐ │只 │ ┌───┬──────┼──┤ │.尹万 │比】..1,一 │.一 │ ├───┼──────┴──┼─┐│二 │ │三││ │ └─┘└───┘ ┌─┐ │ │ └─┘ ┌─┬──┬───┐ │这│山 │气l‘ │ ├─┼──┼───┼─┐│户│厂 │ │滋│└─┴──┘ │ │ └─┘ ┌─┬─┬─────┬─┬─┐ │( │丁│ 百卜 │ │ │ │ │ │毋一锭铱─┼─┼─┼─┬────┐ │ │ │ │}!、1 │口│冈│I{│不一口2.│┌──┼─┼─┼─┼───┼─┼─┴─┼────┤│粉’│气│尹│褪│卜沁人│耳│ │守Z。 │└──┴─┼─┴─┴┬──┴─┘ │ │ │蛋币 │ │ │ └────┘ └────┘ 水轮机安装高程示意图 (a)混流式;(b)轴流式;(C)横轴反击式 立轴反击式水轮机安装高程Z,表达式 混流式Z,一Z。+11,+以./2 轴流式Z一Z“+月+d 横轴反击式水轮机安装高程Z,表达式 Z,一Z。+H、一DI/2式中八〕为导叶高度;d为叶片转动中心线至导叶中心线高差;D!为转轮直径。Z。为设计尾水位:①多机组水电站通常采用1台机组发出额定出力时相应流量时的尾水位。②无调节的径流水电站可采用相当设计保证率的枯水流量的尾水位。月,为水轮机吸出高度.高出设计尾水位的取正值,低于设计尾水位的取负值:山立轴混流式水轮机为设计尾水位至导叶机构下环平面的高差。②立轴轴流式水轮机为设计尾水位至叶片转动中心的高差。(匆横轴反击式水轮机为设计尾水位至转轮叶片最高点的高差。 冲击式水轮机安装高程,应使得水斗最低点高于尾水槽(坑)内设计最高尾水位.并留一定的安全余度.保证转轮都处于大气下运行。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条