1) boiler units
锅炉机组
1.
The operational situation of 2×900MW supercritical boiler units after commissioning in Shanghai Waigaoqiao Second Electric Power Co.
介绍了上海外高桥第二发电有限责任公司2×900 MW超临界锅炉机组投产以来的运行情况,对再热器汽温偏低的问题进行了分析,阐述了再热器汽温的几种调节方法及效果,探讨了煤混烧时磨煤机的运行方式、电耗及对再热汽温的影响,还对吹灰系统应用优化专家系统所取得的效果进行了论证。
2.
Only by better grasping the influence rules of work conditional change on parameters,reasonable adjustments can be done during the operation to ensure safety,stability and economical operation of the boiler units.
锅炉机组是按照额定工况进行设计的,但实际上锅炉往往是在非设计工况下运行,这时,各工况参数都可能要发生改变。
3) CFB boiler unit
CFB锅炉机组
1.
Approach on reduction of house power consumption in 300 MW CFB boiler unit;
降低300MW CFB锅炉机组厂用电的探讨
5) MW PC boiler
135MW机组煤粉锅炉
补充资料:1100mm×12.7mm大型冷弯型钢机组(汉口轧钢厂)
1100mm×12.7mm大型冷弯型钢机组(汉口轧钢厂)
一睽 1100mmx12.7mm大型冷弯型钢机组(汉口轧钢厂)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条