1) sealing water pipe
![点击朗读](/dictall/images/read.gif)
密封水管
2) water-stop
![点击朗读](/dictall/images/read.gif)
水密密封
3) liquid-filled flexible hose seal
![点击朗读](/dictall/images/read.gif)
管式密封
4) sealed casing ring
![点击朗读](/dictall/images/read.gif)
密封套管
1.
The application study of self-manufacturing sealed casing ring preventing tracar leaked gas in laparoscopy .;
自制密封套管预防腹腔镜漏气的应用研究
5) Sealing of Tube-ends
![点击朗读](/dictall/images/read.gif)
管端密封
6) piston ring of HP inlet
![点击朗读](/dictall/images/read.gif)
插管密封
1.
It demonstrates that the issues can be solved completely by improving dummy piston seal ring,removing packing strip and repairing piston ring of HP inlet etc.
针对聊城电厂600MW汽轮机1号机组2002年投运以来,长期存在高压上、下缸温差偏大问题,从机组的运行数据、高压缸的结构特点及气动性能等多方面进行了综合研究分析,找出了引起高压上、下缸温差偏大的主要原因,通过实施优化平衡活塞汽封、拆除阻汽片、更换修理插管密封等措施,从根本上解决了高压上、下缸的温差偏大问题。
补充资料:钢筋混凝土循环水管施工
钢筋混凝土循环水管施工
reinforced concrete circulating water pipe construction
gongjln hunn一ngtu xunhuanshu一guan sh一gong钢筋混凝i循环水管施工(reinforced con-erete eireulating water pipe eonstruetion)有现浇和预制两种施工方法。现浇管在挖沟完后,在沟内分段浇筑。预制预应力管在工厂制作,再运到现场敷设。预制管工厂的设备比较简单,如工程地点离工厂较远而该种管子数t多时可将设备搬到现场制造。管子的直径可达3m甚至更大,长度一般为4m。 预制预应力钢筋棍凝土管预制,可用一阶段(展动挤压)工艺或三阶段(管芯绕丝)工艺施工。一阶段工艺系用申立式成型,用加工精密的内外钢套模组合定型,将主钢筋张拉完成后,即浇筑混凝土一次成型,经静定时间后蒸汽养护.三阶段工艺系按上法先浇制混凝土管芯,成型后再在管芯上缠绕预应力钢丝,用机械或电热法张拉,然后再喷盖水泥砂浆保护层,以防钢丝生锈,经水压试验合格后出厂使用。 数设带承插口的钢筋混凝土预制管挖沟徽设.平口对接的钥筋混凝土预制管除挖沟徽设外,还可采用顶管施工(见取水构筑物施工)。挖沟后按设计规定在沟底铺一层黄沙或石子,再用起重机械将预制管逐节吊人沟内、找正位!,在插口上套上橡胶密封圈后,往前一节的承口方向水平加力拉紧,使插口和橡胶圈同时均匀地嵌人承插口内,按此步探依次进行下一节管的安装.橡胶圈本身的直径略大于承插口间尺寸,并有规定的压缩比及防老化剂。在承擂口内侧采用钢衬圈和密封环进行环向水压试验.水压试验的标准按设计和规范要求。安装后进行回坟土,要求在两侧均匀回填分层夯实。 预应力钢筋混凝土管自重较大,在软土地区使用时要做混凝土基础。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条