To research the differences of bearing capacity and the time-related setup of both end-open pile and end-closed pile in soft clay,field test of in-situ static pressures of 36 piles have been carried out within 72 days.
为研究软土中开口桩与闭口桩承载力差异及承载力随时间增长问题,共完成了36组模型桩的原位静压沉桩试验,开口桩与闭口桩各18组,试验持续时间长达72d。
2) closed steel pile
闭口钢管桩
3) semi-closed pile end
半封闭桩尖
1.
The bored pile can lay directly on fallen capacity-holding layer when steel semi-closed pile end is layed into bore hole which can penetrate grit layer.
超长钻孔灌注桩因受现施工工艺制约只能按摩擦桩使用,因沉渣落淤物影响端承力不能有效发挥;现成孔后置入钢制半封闭桩尖穿透沉渣层,可使灌注桩直接坐落在下卧持力层上,从而使端承力可充分发挥作用进而提高钻孔灌注桩的承载力与减少沉降量,也可缩短桩长、减少施工难度、降低工程费用。
4) open-ended pipe pile
开口管桩
1.
Development and expectation on soil plug in driving or jacked open-ended pipe piles;
开口管桩土塞效应研究进展及展望
5) large-caliber pile
大口径桩
1.
It in case the location geologic environment multiplication,it is better to select large-caliber pile.
在立筒库这种工业建筑建设工程中,因高宽比较大、竖向荷载大、有水平荷载、进出粮动荷载作用等特点,使其基础设计较为复杂,如遇场地地质环境多元化、地基软弱等复杂地质条件,可选用大口径桩(≥800mm)。
6) chamfer stake
坡口桩
1.
This paper analyzes the lack of traditional settingout method and the advantage of digitalization settingout method when analyzing settingout of chamfer stake in cubic meter of earth and stone.
分析了土石方工程中坡口桩放样时,传统放样方法的不足和数字化放样方法的优点。