1) Shuangjiangkou rock-fill dam
双江口土石坝
1.
Application of viscoelastic artificial boundary to dynamic response analysis of Shuangjiangkou rock-fill dam;
黏-弹性人工边界在双江口土石坝动力分析中的应用
2.
Applying viscoelastic artificial boundary to dynamic response analysis of Shuangjiangkou rock-fill dam,the effect degree concerning earth-rock dam dynamic response based on viscoelastic artificial boundary and the radiation damping effect of foundation is evaluated.
应用黏-弹性人工边界于双江口土石坝的动力响应分析中,考察了黏-弹性人工边界及地基辐射阻尼效应对土石坝动力响应的影响程度。
3) Lianghekou Rockfill Dam with Clay Core
两河口粘土心墙土石坝
4) Danjiangkou Dam
丹江口大坝
1.
Research on Environmental Supervision of Danjiangkou Dam Project in the Middle Route Project of South-to-North Water Transfer;
南水北调中线丹江口大坝加高环境监理研究
2.
Study on kerf plan of right bank turning dam section for Danjiangkou Dam Heightening Project;
丹江口大坝加高工程右岸转弯坝段锯缝方案研究
3.
Study on Heel Stress of the Heightening Project of Danjiangkou Dam;
丹江口大坝加高工程坝踵应力研究
5) embankment dam
土石坝
1.
Application of low elastic modulus concrete anti-seepage wall in embankment dams;
低弹模混凝土防渗墙在土石坝工程中的应用
2.
CDesign and construction of composite geomembrane in tilting core embankment dams;
土石坝复合土工膜防渗斜墙的施工设计
6) high earth-rock dam
高土石坝
1.
Effect of geomembrane and core-wall united impervious system on arch effect of core-wall in high earth-rock dams;
膜土联合防渗系统对高土石坝心墙拱效应的影响
2.
Nonlinear analysis of slope stability for high earth-rock dams;
高土石坝坝坡稳定非线性分析
3.
Research on slope seismic stability analysis of high earth-rock dams;
高土石坝坝坡抗震稳定分析的研究
补充资料:双马石红军哨口工事遗址
双马石哨口遗址位于江西茨坪的西南面,海拔1200米,是井冈山军事根据地五大哨口之一。此处因有两块大石重叠在一起,远看犹如两匹骏马,故称“双马石”。
1927年10月,毛泽东同志率领秋收起义部队到达荆竹山后经双马石进驻大井村。
1928年5月,红四军在此设立哨口,修筑四个工事、三道防线,控制着从湖南及江西遂川方向前来进犯的敌军。
1929年1月,红五军十二大队在大队长黄龙的指挥下在此哨口防守。井冈山失守后,彭德怀命令守卫在此的红军到茨坪集中突围,向赣南转移。
1988年9月,井冈山人民政府公布“双马石哨口遗址”为市级文物保护单位。 秋收起义
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条