1) water-saving in construction
节水施工
2) Arhythmic Pipelining Building
非节奏流水施工
1.
Methods of Arhythmic Pipelining Building Schedule Cartography;
非节奏流水施工进度计划的直接绘图法
3) unregular flowing water construction
无节奏流水施工
1.
At last,through engineering actual examples,elaborates priority election of unregular flowing water construction order,so as to give a reasonable arrangement for it,and furtherly enhances the production efficiency of labor and engineering quality.
对无节奏流水施工进行了介绍,探讨了组织无节奏流水施工的要点,分析了无节奏流水施工的主要参数,提出了确定工期的方法,通过工程实例,对无节奏流水施工顺序优选进行了说明,以合理安排无节奏流水施工顺序,从而提高劳动生产率和工程质量。
4) different beat flow construction
异节拍流水施工
1.
Direct rendering method of different beat flow construction procedures planning
异节拍流水施工进度计划的直接绘制法
5) water saving in construction
施工节水行为
6) flow construction without steps
无节拍流水施工
1.
Procedure compilation and application of the flow construction without steps
无节拍流水施工进度编制的方法及运用
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条