说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 混凝土顶升过程
1)  process of hoisting concrete
混凝土顶升过程
2)  concrete lifting
混凝土顶升
1.
According to the engineering practice of Zhaojiagou Bridge in Pudong North Road, the article sets forth in detail the construction control of the concrete lifting for the steel-pipe concrete bowstring arched bridge able to provide the reference for the relative construction members.
该文结合浦东北路赵家沟大桥的工程实际,详细阐述了钢管混凝土系杆拱桥混凝土顶升的施工控制,可供相关施工人员参考。
3)  pumping-up concrete
泵送顶升混凝土
1.
Engineers apply permanent rectangular-steel-box formwork and the construction technique of pumping-up concrete to solve the construction difficulties.
本文总结了钢筋混凝土柱泵送顶升混凝土的过程,为今后类似工程提供可借鉴的施工方法。
4)  concrete fracture process
混凝土断裂过程
5)  Life Course of Concrete
混凝土生命过程
6)  concrete pipe-jacking
混凝土顶管
1.
For concrete pipe-jacking, there are no special design codes,so water supply and draniage code experience are used in design.
混凝土顶管设计没有专门的设计规范,在设计中大多结合给水排水规范和工程类比经验。
补充资料:顶升
      利用千斤顶和交替填塞的柱块,将在地面上就地拼装或灌筑成型的屋盖结构逐步顶升到设计标高的施工方法。这种方法无需大型起重设备,可将在地面施工完毕的整个屋盖,包括屋面防水、油漆及管线等,一次顶升就位。一般有上顶升和下顶升两种。
  
  ① 上顶升法。千斤顶倒支于屋盖结构支点下的垫块上,垫块即为以后的柱帽。开始时,柱帽支承于柱基块的两侧冀上,随着千斤顶的进油和回油,填进临时垫块和换填正式柱块,柱帽即将屋盖结构逐步升高。柱块为方形和门字形(见图)。柱块在安装时宜及时铺垫水泥砂浆及焊接帮条,并对柱块的开口加以封闭,以增强柱子的稳定性。上顶升法中千斤顶的顶升重量恒定,稳定性较好,目前采用较多。因属高空作业,顶升过程中应采取措施,防止屋盖结构偏移,并注意顶升的同步。
  
  
  ② 下顶升法。千斤顶始终放在柱基上,随顶随填柱块,可以减少高空作业,但顶升重量逐渐增加,尤其是在柱基处形成活动支点,稳定性差,已较少采用。
  
  顶升法也有用格构柱的,比填柱块安全,能防止结构偏移。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条