说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 桩土面积置换率
1)  pole-soil area replacing ratio
桩土面积置换率
2)  area replacement ratio
面积置换率
1.
In a composite foundation of cement\|soil pile, the area replacement ratio and the thickess of a consolidation layer(pile length)become the two main factors that affect the property of the composite foundation when the quantities of cement and admixtures are definited.
对于水泥土桩加固的复合地基 ,在确定了水泥及其外掺固化剂的掺入量后 ,面积置换率和加固层厚度即桩长是影响复合地基特性的两个重要的因素。
3)  the concrete exaltation strength
桩头置换
4)  area of pile head
桩头面积
5)  the incidence of soil erosion area
水土流失面积发生率
1.
Based on the synthetic panel data of the incidence of soil erosion area and the impoverishment rate in Chinese provinces domains,through the establishment of economic model and quantitative analysi.
简要综述了国内水土流失与贫困相关性方面的研究,基于全国各省域的水土流失面积发生率与贫困发生率的合成面板数据,通过建立经济模型,计量分析发现,地区水土流失面积发生率与贫困发生率高度正相关。
6)  Land-use change rate
土地利用面积变化速率
补充资料:土桩挤密法
      按预定平面位置,采用沉管、冲击或爆破等方法成孔,然后在孔中填以素土(粘性土)或灰土,分层捣实,形成土桩。土桩与挤密后的桩间土组成复合地基,共同承受基础所传递的荷载。此法常用于处理湿陷性黄土地基、 杂填土地基和填土地基,处理深度一般为5~10米,最大处理深度可达15米以上。处理后的地基承载力一般提高50~100%。
  
  土桩(包括灰土桩)挤密地基的桩径、桩距和孔深通过试验求得。桩孔直径一般为30~50厘米,桩距(桩孔的中心距离S)约为桩孔直径的2~3倍,可按下式确定:
  
  
  
   式中d为土桩的设计直径;γd为地基挤密前,土的平均干容重;γ媁为地基挤密后,桩间土的平均干空重。
  
  桩孔宜按等边三角形的顶点布置。桩孔深度,可根据土中应力分布及下式确定:
  
  
  
  
    Pz+Pcz≤Ps式中Pz为土桩底标高处的附加压力;Pcz为土桩底标高处的土自重压力;Ps为土桩持力层土的湿陷起始压力或容许承载力。
  
  自50年代开始,中国应用土桩挤密法对西北地区某些建筑物的湿陷性黄土地基进行处理,获得了良好的技术经济效果。自70年代起,这种方法已用于民用建筑物的地基处理。用灰土桩挤密地基是60年代在土桩挤密法的基础上发展起来的,两者的作用和工艺、设备基本上相同。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条