1) key point of the equipment and system
设备及系统的关键点
4) key equipment
关键设备
1.
Establishment and development of key equipment monitoring and control system in the No.1 Steel-making Plant;
第一炼钢厂关键设备监控系统的建立与开发
2.
Remote monitoring and control system for key equipment in coal-mine based on signal acquisition and data analysis
矿井关键设备运行状态信号采集分析与远程监控系统
3.
This paper mainly introduces the working principle and key equipment of the dry dedusting system for the 120-t converter in Laiwu Steel.
主要介绍了120t转炉干法除尘系统的工作原理和关键设备。
5) equipment and pipe system
设备及管道系统
1.
Put forward the emphasis of preparing work and trial run before a new built PET plant start-up,including working out the network plan,washing the equipment and pipe system,calibrating the plant,and making the leakage test,the linkage and feeding trial run.
提出了新建聚酯装置投产前工作准备和试车工作的要点,包括网络计划的编制,设备及管道系统的清洗,装置的标定,泄漏试验,联动试车及投料试车。
6) dust catch system and equipment
除尘系统及设备
补充资料:设备的日常点检和定期检查
日常点检是指由操作工人按规定标准,以五官感觉为主,对设备各部位进行技术状态检查的设备状态管理维修方法,定期检查是由指维修工人按规定的检查周期,以五官惑觉或仪器对设备性能和精度全面检查和测量的设备状态管理维修方法。