1) Shenxigou Ditch-water Treatment Project
深溪沟沟水处理工程
1.
Excavation and Supporting Technology of Drainage Tunnel with Particular Geological Conditions in the Shenxigou Ditch-water Treatment Project;
深溪沟沟水处理工程排水洞地质条件复杂,主洞开挖过程中受断层、堆积层、不良地质段等条件约束,流沙、涌水、涌泥、塌方等地质灾害难以避免,必须超前考虑各种应对措施,以便及时调整施工方案,提高施工效率和确保施工安全可靠。
2) Shenxigou hydropower station
深溪沟水电站
1.
Foundation Treatment Construction of the Inlet Cofferdam of Diversion Tunnel of Shenxigou Hydropower Station;
深溪沟水电站导流洞进口围堰基础处理施工
2.
Study on the Seepage Treatment During the Construction of Diversion Tunnel of Shenxigou Hydropower Station;
深溪沟水电站导流洞施工期渗水处理方案研究
3.
Shenxigou hydropower station is being built on the middle reach of the Dadu River , with installed capacity of 660MW and annual power generation of 3203 GWh and will be cascade power station downstream of Pubugou hydropower station.
深溪沟水电站装机容量660MW,年发电量32。
3) ecological sewage treatment technique with underground ditch pattern
地沟式污水生态工程处理技术
5) Deeply buried ditch
深埋水沟
6) Mafanggou Water Lifting Engineering
马房沟提水工程
1.
Comprehensive Influence of the Construction of Mafanggou Water Lifting Engineering;
兴建马房沟提水工程对环境的综合影响
补充资料:电磁原理"水处理"和"水软化"的区别?
在软化过的水中,钙、镁等成分被钠所替代;而在被(经特定电磁原理)处理过的水中,只是钙离子的晶体结构被改变,使其以一种很小的颗粒状态溶于水中。这两种方法都能防止水管内的水垢生成。
在被"处理"过的水中,对人体有益的钙等成分还保留在水中,而且是以人体能吸收的状态(溶解状态)存在。
在被“软化”过的水中,水中的钙等矿物质成分被滤掉,而钠成分增多,使水不能用于饮用。
在被"处理"过的水中,对人体有益的钙等成分还保留在水中,而且是以人体能吸收的状态(溶解状态)存在。
在被“软化”过的水中,水中的钙等矿物质成分被滤掉,而钠成分增多,使水不能用于饮用。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条