1) risky section
险工
1.
Rehabilitation of Yellow River risky sections:technology and its application;
黄河险工改建关键技术与应用
2) project insurance
工程保险
1.
New pattern of the relation between the project insurance contractors and the constructionsafety;
基于施工安全的工程保险模式研究
2.
Function and execution of project insurance in project risk management
工程保险在工程风险管理中的作用及实现
3) industrial injury insurance
工伤保险
1.
Coalmine Explosion Safety Grade Assessment and Its Application in Mining Industrial Injury Insurance;
煤矿爆炸安全分级评价及其在煤矿工伤保险中的应用
2.
Industrial Injury Compensation Against a Background of Industrial Injury Insurance;
工伤保险背景下的工伤损害赔偿
3.
Concurrence between the Industrial Injury Insurance and the Personal Injury Compensation;
工伤保险与人身损害赔偿之竞合
4) Employment Injury Insurance
工伤保险
1.
Research of the Application of Rate System about Employment Injury Insurance;
工伤保险费率机制的应用研究
2.
The establishment of employment injury insurance system introduced the allocation of the consequence of employment injury, which to.
工伤保险制度的出现,使工伤事故损害实现了社会化分担的后果,保障了劳动者的合法权益,但也给传统上对工伤损害采用侵权行为的民事赔偿方式带来了一定的影响。
3.
The employment injury insurance, or industry accident insurance, is a social insurance system, when the worker is wounded (or contracts occupational disease), cripples, the de.
工伤保险又称职业伤害保险,指劳动者在工作中或法定的特殊情况下发生意外事故,或因职业性有害因素危害,而负伤(或患职业病)、致残、死亡时,对其本人或供养亲属给予物质帮助和经济补偿的一项社会保险制度。
5) Injury insurance
工伤保险
1.
Research on Injury Insurance about Peasantry Worker in Construction Industry;
建筑行业农民工工伤保险研究
2.
The similarities and differences of industrial injury insurance and employers liability insurance
工伤保险与雇主责任险的异同——从赔付规则角度谈的异同
3.
[Objective]To analyse the payment of occupational injury insurance fund in Wuxi in order to estimate the social economic loss.
[方法]通过对无锡市2003~2004年工伤保险基金支付存档资料的分析,计算不同性别、年龄、受伤部位和性质、行业类别的工伤人数及费用支付。
6) project risk
工程风险
1.
Counter measures of proprietors to deal with project risks;
业主对工程风险的应对措施
2.
In recent years,the increase of project risk has made the banks bear corresponding larger and larger risk in project loan items.
近年来,工程风险的增加使得银行在工程贷款项目中承担的风险也随之加大。
3.
This paper proposes a control method to solve remotely the project risk under this situation, and has analysed among others some of the key points and bottlenecks.
本文针对这一现象,提出用工程风险远程控制方法解决,并分析了其中的要点和难点。
补充资料:险工
1.容易发生危险的工程。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条