1) cement-slag-molding-bed construction technology
![点击朗读](/dictall/images/read.gif)
水泥炉渣胎模施工技术
1.
This paper probes into cement-slag-molding-bed construction technology for reinforced concrete groined roof from various aspects, and proves its carryover effect with actual example.
从多个方面探讨了钢筋混凝土穹屋顶水泥炉渣胎模施工技术,并通过实例证明了其实施效果。
2) blast-furnace slag cement
![点击朗读](/dictall/images/read.gif)
炉渣水泥
3) slipform construction of concrete pavement
![点击朗读](/dictall/images/read.gif)
水泥砼滑模施工
4) blast furnace slag cement
![点击朗读](/dictall/images/read.gif)
高炉炉渣水泥
5) slip-form construction technique
![点击朗读](/dictall/images/read.gif)
滑模施工技术
1.
The reinforced concrete chimney (180M high), which is the second engineering of Yuelian Power Plant in Lianzhou city of Guangdong, adopts the double slip-form construction technique when building the shaft s inside and outside.
广东省连州市粤连电厂二期工程 180m高钢筋砼烟囱筒身内、外筒壁采用双滑模施工技术。
6) formwork construction technology
![点击朗读](/dictall/images/read.gif)
模板施工技术
1.
In following below, introduced formwork variety andconstruction technology, study better of formwork construction technology in ourcountry nowaday and application, and formwork development trend.
我国工程建设规模越来越大,要求越来越高,因此要求施工技术必须不断开发和创新,必须采用先进的模板施工技术,才能满足现代建筑工程施工的要求。
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。