2) elevation adjustment
标高调整
1.
The field test data is stable and reliable,it can provide basis for vibration fault diagnose and reference for shafting elevation adjustment.
实测结果表明:系统分辨率为1μm,测量精度为15μm,能连续在线同时监测大型汽轮发电机组各轴承绝对标高和相对标高变化;现场实测数据稳定、可靠,可为振动故障诊断提供依据,为轴系标高调整提供参考。
2.
Through elevation adjustment and the second embedding,installation deviations induced by concrete construction are eliminated,and the requirement that all anchor bolts are installed for one time without expanded hole is satisfied.
通过采取标高调整,二次埋设等技术措施,消除了混凝土施工造成的安装偏差,达到了锚栓孔无一扩孔,一次安装到位的要求。
3) template elevation
立模标高
1.
This paper is concerned with monitoring and control calculation、discrete model and determination of cable tension and template elevation.
主要对该桥施工监控计算的计算方法、模型离散、斜拉索张拉索力的确定和挂篮立模标高的确定进行了论述。
4) formwork placing elevation
立模标高
1.
Meanwhile, the formwork placing elevation is influenced by several factors, especially the influences caused by mid cable force .
同时,在悬臂浇注的PC斜拉桥施工控制中,立模标高很容易受到多方面因素的影响,特别是中间索力和前支点挂篮对立模标高的影响不容忽视。
5) adjusting screw for elevation
标高调整螺丝
补充资料:凸模高度调整结构
图1为凸模高度调整结构。凸模的上端面,与滑块接触。滑块右端开有T形槽,容纳螺钉的头部。转动螺钉,则滑块随之移动。由于滑块与上模座以斜面相互接触,而凸模在固定板内是滑动配合,因之凸模在合模方向的位置得以调整,调整后用螺母紧定。

图1 凸模高度调整结构
1-固定板 2-滑块 3-凸模 4-上模座
5-螺钉 6-螺母
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条