说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 双侧壁导坑施工法
1)  two-side wall pilot construction
双侧壁导坑施工法
2)  double side drift method
双侧壁导坑法
1.
Combining Guangzhou s east section Longtoushan tunnel construction of Jingzhu main national line,it put emphasis on introducing double side drift method by tunnel excavating and its advance supporting and initial supporting can provide the reference to similar engineering construction.
结合京珠国道主干线广州东段龙头山隧道施工,重点介绍隧道开挖采用的双侧壁导坑法、超前支护以及初期支护,可供类似工程施工参考。
3)  both side heading method
双侧壁导坑法
1.
Application of the both side heading method in the large span tunnel construction
双侧壁导坑法在大跨度隧道施工中的应用
2.
In order to ensure the construction security,in the situation which the overbridge can not be demolished,separately had considered both side heading method,the pile foundation underpinning method as well as the directly passing method.
北京地铁光华路车站采用分离岛式结构,车站中洞与2个侧洞均要穿越山海丹过街天桥桥桩,为保证施工安全,在天桥不能拆除的情况下,分别考虑了双侧壁导坑法、桩基托换法以及直接穿越法。
4)  double side-wall heading excavation
双侧壁导坑
1.
According to the complex geological conditions of the upward tunnel in the shallow buried area,a more secure method of double side-wall heading excavation method is used.
根据仰口隧道浅埋区的复杂地质条件,采用了较为安全的双侧壁导坑法开挖,这种施工方法有其自身的诸多优点,在开挖时,它的断面是分为多个工作面施作,每一个开挖工作面在初支作用下立即形成应力闭合状态,充分利用围岩的自承能力,很好控制了整个施工过程中的应力变形量,为施工创造了良好的经济和社会效益。
5)  side heading method
侧壁导坑法
6)  unilateral pilot tunnel method
单侧壁导坑法
补充资料:槽壁法施工
在松软地层中建造地下连续墙的施工方法。从地面上沿预定墙身位置,使用专用机具(抓斗或钻孔机等)分段挖槽,槽内用泥浆护壁,借泥浆循环或机械方法出土。挖成6~8米一段深槽后,放入钢筋笼和接头模型,并在泥浆内应用导管浇灌混凝土。如此逐段进行挖槽筑壁便建成连续的钢筋混凝土墙,称为“地下连续墙”。常用于建造地下建筑工程的基坑挡土墙、工程结构的边墙和水利工程的大坝防渗墙等。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条