1) safety proofing of flood control
洪水安全校核
3) Spillway design flood
校核洪水
1.
According to "Standard for Classification and Flood Control of Water Resources and Hydroelectric Projects"(SL252-2000) and "Classification & Design Safety Standard of Hydropower Projects"(DL5180-2003), the standard of Spillway Design Flood for first chop large scale earth and rockfill dam must be Probable Maximum Flood, or recurrence interval of ten thousand years.
根据《水利水电工程等级划分及洪水标准》SL252—2000和《水电枢纽工程等级划分及设计安全标准》DL5180—2003中的规定,对于一级大型土石坝,应以可能最大洪水(PMF)或重现期10000年作为校核洪水标准。
4) security against flood
洪水安全
5) checked flood level
校核洪水位
6) security checking
安全校核
1.
To meet the need of power system dispatch and operation,a security checking and optimal correction software system for daily generation scheduling is developed.
根据调度生产的实际需求,研发了日发电计划安全校核及最优调整系统,对其功能设计、关键技术等进行了阐述,并对四川省典型断面的安全校核和校正结果进行了分析,结果证明了该系统的有效性和实用性。
2.
The contents and characteristics of security checking system for daily generation scheduling of East China power grid are presented.
阐述了华东网调日计划安全校核工作的基本内容和特点;围绕安全校核系统的具体实现,介绍了该系统的模块组成、数学模型;在此基础上讨论了其核心计算方法——带约束的经济调度(SCED)算法,并比较了节能调度模式下该计算过程与安全校核系统的异同,对SCED的输入和输出数据稍加改造,增加优化模块,使其适用于节能调度;用实际算例说明了安全校核系统的作用。
补充资料:校核洪水
见设计洪水。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条