1) substation civil construction
变电站土建
2) substation construction
变电站建设
1.
In view of the uncertainty in substation construction schedule due to various influencing factors,the merits and demerits of conventional program evaluation and review technique(PERT)module are analyzed.
针对变电站建设工期因受各种因素影响而产生的不确定性问题,分析了传统计划评审技术(program evaluation and reviewtechnique,PERT)模型的优缺点,提出了基于模糊网络计划模型,即将模糊隶属度函数引入到网络进度计划中,建立模糊关键线路模型及其时间参数计算方法,实际应用证明,该模型具有较高的应用价值。
3) substation building
变电站建筑
1.
With substation buildings in Wenzhou region as researching object,the energy consumption of substation was analyzed and detail energy saving design measures were proposed,so as to reduce substation architectural energy consumption,make substation buildings more coordinate with environment and reach energy saving goal.
指出变电站建筑节能是电力生产节能的重要部分,以温州地区变电站建筑为研究对象,分析了变电站的建筑能耗,提出了节能的具体设计措施,以减少变电站建筑能耗,使变电站建筑与环境更加协调,达到节能目的。
4) transformer substation project
变电站建设项目
1.
Then the practical application of transformer substation project was given.
本文在变电站建设项目风险管理理论研究的基础上,识别出了变电站建设项目可能遇到的各种风险;并从风险产生的原因角度构建了具体的变电站建设项目风险评价指标体系;通过对几种常见的项目风险评价方法的分析,提出了改进的LEC风险评价法;并对变电站建设项目案例进行了实证,提出了防范不同程度风险的策略与建议。
5) Built hydropower station
已建电站
6) build a power station
建电站
补充资料:变电站
改变电压的场所。为了把发电厂发出来的电能输送到较远的地方,必须把电压升高,变为高压电,到用户附近再按需要把电压降低。这种升降电压的工作靠变电站来完成。变电站的主要设备是开关和变压器。按规模大小不同,称为变电所、配电室等。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条