说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 主梁立模监控预抬值
1)  pre-raising height for monitoring the main girder
主梁立模监控预抬值
1.
Determination of pre-raising height for monitoring the main girders with full-frame method;
满堂支架法施工中主梁立模监控预抬值的确定
2)  prearranged height
预抬高值
1.
The prearranged height calculations in control points of steel arch ribs during constructing a concrete-filled steel tubular arch bridge are divided into two parts: rigid body displacement and elastic deformation.
对钢管混凝土拱桥吊装施工拱肋控制点的预抬高值分两部分进行考虑:一部分由刚体位移引起,一部分为拱肋弹性变形产生,两部分之和为实际的预抬高值。
3)  monitoring and early-warning computer
监控预警主机
1.
By analyzing the functional requirements of monitoring and early-warning system for major hazards installations and the features of embedded technology,design solutions of the monitoring and early-warning computer is proposed,based on embedded systems.
通过对重大危险源监控预警系统的功能需求分析,并结合嵌入式技术的特点,提出基于嵌入式系统的监控预警主机的设计方案。
4)  stereoscopic supervision framework
立体监控模式
5)  Bridge health monitoring and evaluating
桥梁健康监控预警评估
1.
Bridge health monitoring and evaluating is very useful for bridges safe running.
桥梁健康监控预警评估信息是桥梁安全运行有用的辅助信息。
6)  warning and monitoring model
预警监控模型
补充资料:设备安装前的准备工作——设备的预装配与预调整
设备安装前的准备工作——设备的预装配与预调整
 
文章编辑:moji
文章来源:
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条