说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 工程总承包商
1)  general construction contractor
工程总承包商
1.
However,the Chinese construction enterprises usually have single ability of design or construction due to some reasons,so in this case,if the construction enterprise wants to undertake the general construction contractor project,he has to make decision whether he subcontra.
研究结果:通过总结纵向一体化的理论基础,分析了工程总承包项目的五大特点,从交易费用、生产效率和管理费用、项目优化设计实现、投资大小、资产专用性、市场竞争程度6个方面探讨了影响工程总承包商进行纵向一体化的影响因素,最终论证出单一能力的工程总承包商有动力进行纵向一体化。
2)  engineering general contract
工程总承包
1.
On node examine and value of engineering general contract project
工程总承包项目节点验工计价探讨
2.
Combined with the experiences of Shaanxi Electric Power Design Institute acting as engineering general contract,the advantages and existed problems are analyzed for design institute to execute engineering general contract,the basic qualification which is necessary to execute engineering general contract and the key step during the execution process are discussed.
工程总承包是国际上广泛采用的工程建设项目组织实施方式。
3)  EPC
工程总承包
1.
Introduction of Domestic Technology and EPC Contracting for 600 kt/a DAP;
600kt/a DAP国产化技术及工程总承包介绍
2.
DICUSSION OF DEVELOPMENT OF INTERNA-TIONAL EPC PROJECT OF SINOPEC;
浅谈中国石化国际工程总承包的发展
3.
Equilibrium Analysis of EPC & RMC Market;
工程总承包与工程项目管理的市场均衡分析
4)  general contracting
工程总承包
1.
Developing project management and general contracting with design enterprise features;
开展具有设计企业特色的项目管理和工程总承包
2.
Supply chain system of the general contracting is based on the level of general contracting enterprise.
工程总承包供应链体系建立在总承包企业基础之上,要从总承包企业的内部系统和外部系统两方面进行构建,包括:工程总承包企业的经营思想,采用相适应的工程总承包企业的组织模式,建立与管理工程总承包供应链体系合作伙伴数据库,建立供应链管理实施效果的考核与评价标准,基于信息沟通与交流平台的项目管理信息的集成化,同步化,并需要解决目标相容、信任、沟通交流和合作成本等关键问题。
3.
After analyzing the sub-contracting activity types and some related rules of unlawful sub-contracting under Design-Bid-Build-Accept traditional delivery model,contingent sub-contracting activity categories and corresponding discrimination principles to whether unlawful sub-contracting under Design-Build general contracting delivery model were explored in detail.
分析了当前设计-招投标-施工-竣工验收的传统模式下的工程施工总承包模式下工程分包活动的种类及相关法律法规对违法分包、转包活动规定的基础上,以设计-施工(D-B)总承包为例,详细探讨了工程总承包模式下可能出现的工程分包活动类别及相应的违法分包活动的判别原则。
5)  general contract
工程总承包
1.
This paper discusses the management model and operation process of general contract project item and ana- lyzes the general contractors contract responsibilities and management system.
探讨了工程总承包项目的管理模式和运作过程,并在此基础上分析总结了总承包商的合同责任和管理体系。
2.
In this paper the basic theory and the development of the general contract was described.
阐述了工程总承包模式的基本理论和发展情况,并根据我国现阶段建筑市场的特点,从业主管理的角度,重点分析了总承包模式的应用环境,提出了总承包项目发包范围的确定方法,分析表明这种方法适合我国的国情,且简单而实用。
3.
With the reform and development of project management system in new China, associating with the experience of 14 years general contract in our institute, the paper explains the definition of the general contract in brief, primary method, some questions and its solutions about the domestic general contracts.
通过我国建国以来建设项目管理体制的变革与发展,结合河北省水利水电勘测设计研究院14年来工程总承包的经验,简要阐述了工程总承包的定义、主要方式和目前国内市场存在的一些问题及解决方法。
6)  project general contract
工程总承包
1.
At the same time,some new methodes such as enhancing system construction and adopting project general contract are put forward to control investment effectively.
同时提出了加强制度建设 ,采用工程总承包方式等对投资进行有效控制的新思
2.
In order to define agent construction system s concept and promote its development, from making clear the relationship between agent construction system and project management, this paper brings forward definition of agent construction system, and points out that agent construction system is an especial project management model and is opposite to the project general contract.
为明确代建制的概念,推动代建制的健康发展,本文从理清我国代建制与工程项目管理和工程总承包的关系出发,提出了代建制的定义,指出了代建制是一种特殊的工程项目管理模式,与工程总承包存在对立的关系。
补充资料:承包工程合同的价格条款


承包工程合同的价格条款


承包工程合同的价格条款承包合同中确定工程项目价格的条款。在承包工程合同中,价格条款是最重要、最基本的条款之一,也是业主与承包商合同谈判中的主要问题。价格条款中,要结合工程的技术特点、设计深度确定是属于何种价格的合同,计价时所使用的货币,价格的调整及货币保值的措施。价格构成以每项工程编制的单价表(该表根据工程制成)为依据。是否包括税金、以及税金的种类应由双方协调,在合同中详细规定。合同的价格既有固定价格也有滑动价格。通常采用固定价格。如果项目的执行期很长,规模又很大,在施工期内物价和工资水平都可能发生变化,应采用滑动价格进行调整。调整的步骤为先确定各子项的固定比例,确定价格时的物价指数和支付时的物价指数,然后用滑动价格公式进行调整:__,_M。_N,.._、尸1一尸。(A二7~十万二苦十…十C) 迈V, 0 Jvo尸,为调整后的价格;尸。为原价格;A、B.二为品种系数,Ml、N:为这两种物资调整后的价格;M。、N。是合同签订时的价格;c为固定系数。另外,还需在价格条款中,根据国际货币市场的行情变化趋势正确地选择货币,以减少汇率变化带来的风险。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条