说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 西岸水电站
1)  West Band Hydro Power Station
西岸水电站
1.
Hydraulic Structure Designs of West Band Hydro Power Station;
西岸水电站水工结构设计
2)  bank slope of hydropower station
水电站岸坡
3)  Three Gorges Right Bank Hydropower Station
三峡右岸水电站
1.
Application of H9000TR Condition Monitoring and Trend Analyzing System to Three Gorges Right Bank Hydropower Station;
H9000TR状态监测及趋势分析系统在三峡右岸水电站的应用
4)  Xijing hydropower station
西津水电站
1.
The article checks and calculates the designed flood,checked flood peak flux,flood level,flood discharge ability, and dam height of Xijing hydropower station,which shows the flood discharge ability and dam height can meet the require- ment of security.
文章通过对西津水电站设计洪水、校核洪水洪峰流量、洪水位、泄洪能力以及坝高进行复核计算,以此说明西津水电站的泄流能力和坝高满足安全要求。
5)  small hydropower station in Tibet
西藏水电站
6)  Xihe Hydropower Station
西河水电站
1.
Sand-proof and Water Diversion in the Diversion Keys at Xihe Hydropower Station;
西河水电站取水枢纽引水防沙问题
补充资料:莱特西水电站

莱特西水电站

Letsi Hydropower Station


概  述

  莱特西水电站建于瑞典吕勒(Lule alv)河利拉(Lilla)狭谷。大坝为堆石坝,坝高85m,调节库容0.67亿m3。装机容量45万kW,年发电量17.1亿kW·h。工程于1967年竣工。
  坝址以上控制流域面积9520km2,最大洪水流量1350m3/s,正常水文年洪水流量860m3/s,正常水文年枯水流量29m3/s,最小枯水流量16.5m3/s。坝基为花岗岩。
  大坝坝顶长608m,顶宽8m,总填方量240万m3,其中冰碛土43万m3,反滤材料47万m3,堆石115万m3。灌浆帷幕钻孔长11000m,灌浆水泥用量180t。溢洪道布置在右岸,最大泄量1600m3/s。用隧洞引水至水电站,厂房为地下式,装3台混流式水轮发电机组,设计引用流量390m3/s。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条
拉西瓦水电站  西藏直孔水电站  塔林西水电站  东西关水电站  西南山区水电站 
  ©2011 dictall.com