1) Jingnan Hydraulic Complex
京南水利枢纽
1.
An introduction was made on the operation status and existing problems of miter gate bottom pivots at the ship lock of Jingnan Hydraulic Complex,based on which the author analyzed the causes for integral sinking of gate leaf and regulation becoming difficult,presented the experience in technical improvement and operating maintenance.
介绍京南水利枢纽船闸人字闸门底枢运行状况及存在的问题,分析了导致门叶整体下沉、不能调节的原因,论述了其技术改造和运行维护的经验。
2) Jingnan hydropower station
京南水利枢纽发电厂
1.
Leakage treatment on joint and bottom seals of spillway gate of Jingnan hydropower station;
京南水利枢纽发电厂溢流坝工作闸门节间及底水封漏水处理
3) Nanjing key position
南京枢纽
4) hydraulic complex
水利枢纽
1.
Closure gate design for diversion tunnel of Xiaorongjiang Hydraulic Complex;
小溶江水利枢纽导流洞封堵闸门设计
2.
Sanzuodian hydraulic complex locates at the downstream of the influent Yen river of Xiliao river in Chifeng city, Inner Mongolia, which is the key project for flood control and water supply for the city in the basin plan of Songhua river and Liao river, which main task is to improve the flood control and water supply standard where locates at the distance 35Km from hydraulic complex.
三座店水利枢纽工程位于内蒙古赤峰市境内西辽河支流阴河下游,是列入松花江和辽河流域规划和赤峰市城市防洪供水规划的重点骨干工程,主要任务是提高位于枢纽下游35km处的赤峰市的防洪标准以及向赤峰市供水。
5) hydro-junction
水利枢纽
1.
Study on coupling of 3D visualization with numerical simulation for powerhouse excavation of a certain hydro-junction;
某水利枢纽厂房开挖三维可视化与数值模拟耦合研究
2.
Discussion on seepage prevention of deep overburden layer ofXiabandi hydro-junction in Xinjiang;
新疆下坂地水利枢纽工程深覆盖层防渗问题探讨
3.
Video monitoring system has been widely applied in safe production monitoring for hydro-junction, and gradually developed from traditional security monitoring to management monitoring.
视频监控系统在水利枢纽的安全生产监控中应用非常普遍,并逐步由传统的安防监控向管理监控发展,进行模拟系统的网络化、数字化改造将是必然趋势。
6) hydro junction
水利枢纽
1.
Based on analyzing affecting factors of the designed lowest navigable stage, the problem of calculating the designed lowest navigable stage at downstream stretch of hydro junction is generalized as a nonlinear functional relation between input and output.
在分析影响水利枢纽下游河段设计最低通航水位因素的基础上 ,将设计最低通航水位计算问题概括为一种非线性输入输出的泛函关系 ,以人工神经网络原理建立推算水利枢纽下游河段设计最低通航水位的BP神经网络模型 。
2.
In this paper, achievements gained in conservating soil and water conservation plantation in Wanjiazhai hydro junction region have been introduced.
本文介绍了万家寨水利枢纽区水土保持林建设所取得的成绩。
补充资料:长江三峡水利枢纽鸟瞰图
长江三峡水利枢纽鸟瞰图
长江三峡水利枢纽鸟瞰图 《中国建设企业百强榜》
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条