说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 建设工程市场
1)  construction engineering market
建设工程市场
1.
This paper analyzes main problems in construction engineering market and the effect of selective tendering on construction engineering market environment.
分析了当前建设工程市场存在的主要问题及邀请招标对建设工程市场环境的影响。
2)  engineering construction market
工程建设市场
1.
According to the complexity in engineering construction market in our country the favorable conditions of the system entrusting one company to build and manage are analyzed and discussed as well as the advantages and living space of this system in China.
针对我国工程建设市场的复杂性 ,就目前我国推广代建制的有利条件作了分析 ,论述了实施代建制的优势及代建制在我国的生存空间 ,并提出了在我国推广代建制的必要
3)  municipal engineering construction
市政工程建设
1.
The article discusses the design standards involved in the design of the urban drainage tunnel and the technical problems of the relation of the drainage tunnel with the municipal engineering construction in Guiyang City.
该文对贵阳市这一山区城市排水大沟设计涉及的设计标准以及排水大沟和市政工程建设的关系等技术问题作了探讨。
4)  Shanghai Construction Projects
上海市建设工程
5)  municipal administration construction project
市政建设工程
6)  market construction
市场建设
1.
Promotion of market construction of exploration rights and mining rights contribute to improvement of prospecting and exploitation of mineral resources and its conservation and utilization in our country and supportability of mineral resources for sustainable development of national economy.
推进探矿权、采矿权市场建设对于促进我国矿产资源勘查开发、提高矿产资源保护与合理利用水平、增强矿产资源对国民经济可持续发展保障能力具有重要意义,论述了近年来两权市场建设的进展,提出了今后两权建设的工作方向。
2.
In this paper, according to the surveys in every provinces(municipalities or directly municipalities) of China, the experiences on market construction of exploring rights and mining rights are summarized, its main problems are analyzed, and some suggestions for further fostering and normalization of "the Two Rights" market construction are put forward.
通过全国范围各省(区、市)探矿权、采矿权市场建设情况调研,总结了"两权"市场建设的基本经验,分析了存在的主要问题,提出了进一步培育和规范"两权"市场建设的建议。
补充资料:哪些管线工程不需要申请建设工程规划许可证

下列管线工程不需要申请建设工程规划许可证:
1、工厂、仓库和其他建筑等用地范围内的内部专用管线工程。
2、在施工范围内不影响其他工程建设,并在工程后保证拆除的临时管线。
3、建筑物按照施工图的埋设管线和室内管线。
4、管位轴线和管径不变的原有管线的局部更新。
5、农业生产需要的郊区越野管线和农村广播线。
6、非常时期的临时电线。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条