1) lump sum contract
总价合同
1.
This paper analyzes three common types of construction contracts based on the terms of payment,as the lump sum contract,unit price contract and cost reimbursable contract,and the risk allocation in terms of construction scope,quantity and unit price between the employer and the contractor.
本文分析了总价合同、单价合同和成本补偿合同三种比较常见的工程合同计价方式下,工作内容、工程量、工程单价的风险在业主和承包商之间的分配情况,并对每种计价方式下不同合同类型的风险进行了比较,提出了业主和承包商风险管理的建议。
2.
Through a case of geotechnical investigation quality defects leading to increasing contractor cost,analyzed the quality liability and the risk liability of lump sum contract.
通过勘察质量问题导致施工单位增加工程款的案例,对固定总价合同的质量责任和风险责任进行了分析,提出在这种情况下可以借鉴保险制度中的代位求偿权,并对求偿的额度和注意事项进行了说明。
3) fixed price contract
固定总价合同
1.
On the strategy to prevent contract risk in fixed price contract;
浅析固定总价合同的合同风险防范策略
2.
Risks and precautions of contractors in fixed price contract;
固定总价合同中承包商的风险与防范
3.
Discussion on the characteristics and risk and prevention of fixed price contract
谈固定总价合同的特点和风险及防范
4) total contract sum
工程合同总造价
5) contracting project of fixed total price
固定合同总价包干工程
6) firm lump-sum contract
[管]固定工程总价合同
补充资料:涉外总价合同
涉外总价合同发包方支付给承包方的费用采用一揽子估价方式,一次总付办法的合同,又称“固定价格合同”。采用这种计价和合同方式时,必须在合同中明确规定工程项目的范围,写明工期;工程价格在合同签订时预先确定,但往往在合同中规定,在工作范围有根本性变动时,合同价格随之调整。
总价合同有四种不同形式:
1.固定总价合同;
2.调值总价合同;
3.固定工程量总价合同;
4.管理费总价合同。
适用于项目确定的工程。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。