1) wind-entering speed
进风速度
1.
The said tower model is simplified,and the simplified tower model being deduced by using the hydrodynamics,the theoritic calculation formula and relative parameters formula of wind speed at entrance of the wind channels(inlet wind velocity) being obtianed,and thereby the relationship among the wind-entering speed,the length of heating section,the number of wind-entering channels,the radius.
将热力发电塔模型简化,并利用流体力学对热力发电塔简化模型进行推导,获得进风通道口风速(进风速度)的理论计算公式和相关参数公式,并由此得到进风速度与加热段长度、进风通道数目、进风通道半径、加热温度等的关系。
2) tempo
[英]['tempəʊ] [美]['tɛmpo]
速度;进度
3) progress risk
进度风险
1.
A model for progress risk analysis based on multiple risk probability was constructed according to the risk distribution characteristics of naval gun system development.
针对舰炮武器系统研制工程进度的风险分布特征,建立了基于多元风险概率的进度风险分析模型,给出了基于正态分布和指数分布的进度风险估算方法,并结合具体风险因素分析了舰炮武器系统研制进度风险评估的指标和准则,最后给出某型大口径舰炮研制的风险分析实例,验证了文中方法的有效性和可靠性。
2.
The progress risk research in identifying and estimating of major model projects is described first, then a method of progress risk analysis based on Monte Carlo simulation is provided and a case study is presented in detail to illustrate the total process of the method.
对重大型号工程进度风险的识别和估计方法进行了讨论,研究了总工期风险的蒙特卡罗仿真方法,并结合实例对某型号项目研制进度风险进行了定量分析。
3.
tactical and technical targets,progress and cost) in the aerospace projects,this paper puts forwards a random network model of aerospace project development process by using the theory and method of random network,analyses the expensie risk and the progress risk of the project.
鉴于各种不确定性因素对航天三项关键参量(战术技术指标,进度和费用)影响的重要性,应用随机网络理论和方法,建立了航天项目研制过程的随机网络模型,对航天项目进度风险和费用风险进行了定量化分析和研究。
4) inlet air temperature
进风温度
5) schedule risk
进度风险
1.
Study of Chemical Product Manufacturing Relocation Project Schedule Risks;
产地转移化工项目进度风险研究
2.
This paper established is a risk analysis models of normal distribution, β distribution and triangular distribution of Graphical Evaluation and Review technique, for the study of the character of developmental program of weapon equipment schedule risk distribution.
为研究装备研制工程进度的风险分布特征,建立了包含正态分布、β分布、三角分布的随机网络 进度风险分析模型,通过蒙特卡罗法仿真获得工程项目的进度估计及其统计分布特性,从而获得工程总工期的 风险,并结合实例进行了分析。
3.
Then,the definition of construction schedule risk is given and the MC simulation method for the schedule risk is proposed.
分析水利水电工程施工进度计划对工程建设动态投资的影响 ,给出施工进度计划风险的定义 ,提出施工进度风险计算的MC仿真方法 。
6) inlet air angle
进风角度
补充资料:多通道电子风速计(见转杯式风速表)
多通道电子风速计(见转杯式风速表)
爹豁笔戮翁ng’粗转杯式风速表。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条