1) timed job
定时作业
1.
The implementation method of timed job and multi-job mechanism in SQL Server 2005 data base system is studied.
目的研究定时作业和多作业协调机制在SQL Server 2005数据库系统中的实现方法。
2) operation time measurement
作业时间测定
3) work time
作业时间
1.
A study of work time in sewing line;
服装缝制车间作业时间研究
2.
Each working procedure work time of various assembly flow line is tested through scientific calculation.
通过测算不同装配流水线上各个工序作业时间,利用聚类分析技术将各流水线按不同作业时间进行聚类,并画出装配时间谱系聚类图。
4) Operation time
作业时间
1.
The conclusion is that rotary drilling machine's operation time and failure time conform to Weibull Distribution Principle.
系统地研究了齐大山露天铁矿牙轮钻机的作业、故障和待作业时间,计算出了其固有和实际可用度,提出了影响各钻机实际可用度的因素,同时指出牙轮钻机的作业和故障时间服从威布尔(Weibull)分布。
2.
The relationships between operation time and material moving distance for both cases of using hauler and forklift are studied,and hence the material moving efficiencies for both cases at different moving distances are obtained.
利用现场IE方法对物料运输时的运输路线、动作、时间等因素进行标准化模拟分析,研究拖车与铲车上线作业时间与运输距离的关系,从而得出不同运输距离情况下拖车与铲车的运输效率。
5) fishing time
作业时段
1.
The effects of four factors on jigging efficiency,fishing water depth,period of fishing time,degree of stomach fullness(DSF) and phase of the moon,were analyzed according to the cruising data from Northwest Indian Ocean Symplectoteuthis oualaniensis fishing ground.
根据印度洋西北部鸢乌贼(Symplectoteuthis oualaniensis)作业渔场的现场调查数据,分析了作业水深、作业时段、摄食等级和月相等因子对手钓上钩率的影响。
6) work opportunity
作业时机
1.
According to the practice of hail suppression in recent years in Lushi county,the paper summarizes the choice of shot point in mountainous,the hail cloud recognition,the work opportunity,the usage of shell quantity and so on the important technical main points.
根据卢氏县近几年来防雹工作的实践,总结了山区防雹炮点的选择、冰雹云的识别、作业时机的把握及用弹量等重要技术要点。
补充资料:兵棋作业(见想定作业)
兵棋作业(见想定作业)
war gaming exercise
bingqi zuoye兵棋作业(war ga而ng exercise)见想定作业。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条